Adams County, Colo., funds by Interior, Department of
Listing $9,460,516.70 in stimulus funds from Interior, Department of for Adams
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
C3 LIMITED LIABILITY COMPANY | $1,969,142 |
ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE
This spending item is part of a $3,354,562 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/12/2010 |
PRECAST CONCEPTS, LLC | $1,710,045 | Precast Concrete Box Culverts, Pole Hill Canal, Colorado-Big Thompson Project, Colorado | Bureau of Reclamation | 3/24/2010 |
ROCKSOL CONSULTING GROUP INC | $1,333,488 |
Onsite Inspection of Dewatered Urbanized Canals. Bureau of Reclamation Project No. 8.000, TAS::14 0681::TAS
This spending item is part of a $2,257,932 allocation.
See details
|
Bureau of Reclamation | 7/16/2010 |
Core Electric, Inc. | $1,042,000 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
H. B. STUBBS HOLDINGS, INC. | $797,144 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
CRAIG BROTHERS PLUMBING & HEATING INCORPORATED | $537,615 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
COLORADO NETWORK STAFFING, INC. | $223,447 | Construction inspection services for the Weber Branch Siphon and Weber Coulee Siphon construction project located in central Washington near Ephrata. | Bureau of Reclamation | 2/25/2010 |
Thoutt Brothers Concrete Contractors, Inc. | $210,493 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
Front Range Excavating, Inc | $174,500 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
Rocky Mountain Geothermal, Inc | $142,662 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
ACE EQUIPMENT & SUPPLY CO. | $136,585 |
Grand Teton National Park: Colter Bay. Construction of metal shop and storage building,. Project also includes demolition of unsafe structure, sampling of possible contaminated soil, remediation action, and site restoration.
This spending item is part of a $2,674,390 allocation.
See details
|
National Park Service | 9/18/2009 |
Independent Roofing Specialists, LLC | $136,398 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
WAGNER EQUIPMENT CO. | $102,552 | Equipment rental | Indian Affairs (Assistant Secretary) | 9/10/2010 |
Aerial Surveys International LLC | $85,000 |
Photo Science will acquire and process digital orthophotography for the northern portion of New Hampshire. This area is estimated at approximately 5,772 square miles (including water). This will include high resolution 0.30 meter (one foot) 4-band ortho
This spending item is part of a $456,911 allocation.
See details
|
Geological Survey | 3/30/2010 |
KUNKEL CONSTRUCTION, INC. | $76,919 | Concrete Steps | National Park Service | 12/12/2010 |
KUNKEL CONSTRUCTION, INC. | $75,719 | concrete blocks to rocky mountain national park--Estes Park, Colorado | National Park Service | 2/12/2010 |
FREELANCE ENTERPRISES, LLC | $62,133 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
SMITH ENVIRONMENTAL AND ENGINEERING | $56,288 | CULTURAL CLEARANCE IN AREA WITH POTENTIAL FOR COMMERCIAL SOLAR ENERGY FACILITY, RENEWABLE CLASS III SURVEY | Bureau of Land Management | 3/26/2010 |
Performance Woodworking Inc | $54,980 |
KANAB OFFICE BUILDING
This spending item is part of a $7,069,529 allocation.
See details
|
Bureau of Land Management | 9/16/2010 |
INNOVATIVE SUPPORT SOLUTIONS | $50,110 | Remove approximately 6593 ft. of of existing chain link fence. Construct approximately 4500 ft. of new woven wire wildlife fence. | U.S. Fish and Wildlife Service | 2/26/2010 |
ESTES, INC. | $44,790 | HERBICIDE- MILESTONE | U.S. Fish and Wildlife Service | 9/24/2010 |
PRECAST CONCEPTS, LLC | $38,208 | Manufacture and deliver 96 ft 8' x 8' precast concrete box culvert | U.S. Fish and Wildlife Service | 9/08/2009 |
COLORADO ASPHALT SERVICES, INC. | $31,336 | Asphalt Cold Patch | National Park Service | 4/13/2010 |
Peak Power, LLC | $27,900 |
This project includes providing all materials, equipment, some minor design, and labor required to completely reconstruct four (4) permanent water pumping stations located on the Green River in Browns Park National Wildlife Refuge, Colorado for use in wet
This spending item is part of a $920,932 allocation.
See details
|
U.S. Fish and Wildlife Service | 1/29/2010 |
ARAPAHOE FIRE PROTECTION, INC. | $26,950 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
ESTES, INC. | $26,340 | HERBICIDE FOR FISH AND WILDLIFE REFUGE | U.S. Fish and Wildlife Service | 7/02/2009 |
Dalco Industries, Inc. | $25,790 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
Domestic Insulation Company Inc | $25,473 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
COLORADO DOORWAYS, INC. | $24,779 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
ESTES, INC. | $24,365 | SOLD HERBICIDE TO US FISH AND WILDLIFE REFUGE | U.S. Fish and Wildlife Service | 6/10/2009 |
ESTES, INC. | $24,365 | HERBICIDE FOR US FISH AND WILDLIFE SERVICE- TO BE USED ON A REFUGE | U.S. Fish and Wildlife Service | 6/12/2009 |
ESTES, INC. | $23,679 | SOLD HERBICIDE TO US FISH AND WILDLIFE REFUGE | U.S. Fish and Wildlife Service | 6/12/2009 |
ACADEMIC SPECIALTIES, INC. | $22,385 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
ROCKSOL CONSULTING GROUP INC | $22,025 |
Architect and Engineering services for New Melones entrance building site development, New Melones Lake Recreation Area
This spending item is part of a $88,499 allocation.
See details
|
Bureau of Reclamation | 5/19/2010 |
ESTES, INC. | $14,487 | SOLD HERBICIDE TO US FISH AND WILDLIFE REFUGE SYSTEM- UNDER AN EXISTING 5 YEAR CONTRACT | U.S. Fish and Wildlife Service | 7/30/2009 |
Contract Commercial Interiors Inc | $14,305 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
BAKER CONCRETE CONSTRUCTION, INC | $14,000 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
Ground Engineering Consultants, Inc | $13,440 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
B H Waterproofing | $10,015 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $7,000 | Recovery Cebolla Creek Geotechnical Study for the Replacement of Railroad Car Bridge in Response to Request for Quotation No. 375469. | Bureau of Land Management | 8/06/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $7,000 | Recovery Cebolla Creek Geotechnical Study for the Replacement of Railroad Car Bridge in Response to Request for Quotation No. 375469. | Bureau of Land Management | 8/06/2009 |
POBLOCKI SIGN COMPANY LLC | $4,015 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
KIMMEL MECHANICAL, INCORPORATED | $3,958 | Remove and replace furnace and coil | U.S. Fish and Wildlife Service | 11/05/2009 |
Apr | $3,567 |
DEMOLITION OF EXISTING STRUCTURE AND REPLACE WITH MODULAR BUILDING AT KING MOUNTAIN.
This spending item is part of a $291,276 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/04/2010 |
Fort Collins Pre-Cast, Inc. | $3,126 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |
B&M PHIPPS | $0 |
Construction of Visitors Center
This spending item is part of a $3,234,284 allocation.
See details
|
U.S. Fish and Wildlife Service | 4/21/2010 |