Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC | $10,182,514 |
The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving
This spending item is part of a $17,355,200 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |
PREMIER DATA SERVICES, INC | $2,064,138 | The Bureau of Land Management (BLM) maintains vital records of public land ownership in Montana and the Dakotas in the form of Control Document Index (CDI) aperture cards. The BLM Montana State Office has only one set of these aging microfilm aperture car | Bureau of Land Management | 3/25/2010 |
PREMIER DATA SERVICES, INC | $1,582,136 |
The BLM in Wyoming received funding under the American Recovery and Reinvestment Act of 2009 (ARRA) to provide accurate and accessible information to spur renewable energy development on public lands. The goal of this task is to provide a complete and acc
This spending item is part of a $2,000,000 allocation.
See details
|
Bureau of Land Management | 3/31/2010 |
ECOANALYSTS INC | $1,102,914 | EcoAnalysts, Inc. received a Recover Act funded award to assist the US Bureau of Reclamation (BOR). The BOR requires field, laboratory, and administrative support towards the early detection study of the invasive Dreissenid larvae in various reservoirs of | Bureau of Reclamation | 12/31/2009 |
PREMIER DATA SERVICES, INC | $735,044 |
The Bureau of Land Management a set of records called the Control Document Index cards. It consists of 35mm microfilmed copies of patents and other documents which convey title to and fiom the United States. There are also copies of documents such as publ
This spending item is part of a $764,991 allocation.
See details
|
Bureau of Land Management | 3/29/2010 |
PREMIER DATA SERVICES, INC | $732,000 | The BLM maintains thousands of historic vital records of public land ownership in Colorado. These records contain copies of original documents that have been microfilmed and are currently stored as a collection of microfilm aperture cards referred to as t | Bureau of Land Management | 3/10/2010 |
KLEINFELDER WEST, INC. | $714,645 |
Canal Inspections for Urbanized Areas - Canal Inspections for Urbanized Areas - onsite inspections to collect data associated with canals in proximity of urbanized areas, analysis of inspection data and follow up inspections as required
This spending item is part of a $3,254,393 allocation.
See details
|
Bureau of Reclamation | 12/29/2009 |
PREMIER DATA SERVICES, INC | $685,205 |
This specific ARRA project is related to the development of renewable energy on public lands that will assist the United States strive for energy independence. These renewable energy sources consist of wind, solar and geothermal possibilities.The goal of
This spending item is part of a $984,309 allocation.
See details
|
Bureau of Land Management | 3/30/2010 |
PREMIER DATA SERVICES, INC | $605,044 |
Under the American Recovery and Reinvestment Act (ARRA) of 2009, the Arizona State Office of the Bureau of Land Management (BLM) has been tasked with ensuring positional mapping accuracy of land records and boundaries in support of renewable energy develo
This spending item is part of a $1,073,044 allocation.
See details
|
Bureau of Land Management | 12/22/2009 |
AGGREGATE INDUSTRIES | $603,580 |
ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE
This spending item is part of a $3,354,562 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/12/2010 |
PREMIER DATA SERVICES, INC | $593,715 |
The Bureau of Land Management (BLM) maintains vital records of public land ownership in California in the form of Control Document Index (CDI) aperture cards. The BLM California State Office has only one set of these aging microfilm aperture cards that ar
This spending item is part of a $878,165 allocation.
See details
|
Bureau of Land Management | 3/18/2010 |
PREMIER DATA SERVICES, INC | $591,902 |
Under the American Recovery and Reinvestment Act (ARRA), the BLM received funding to be used in Fiscal Years (FY) 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage irhastructure investment, promote energy effici
This spending item is part of a $781,149 allocation.
See details
|
Bureau of Land Management | 3/01/2010 |
PREMIER DATA SERVICES, INC | $530,331 |
The goal of this project is to improve the processing of applications for renewable energy on public lands by providing complete, accurate, and easily accessible source documents, records, digital data and map products that would assist, restrict andior p
This spending item is part of a $665,031 allocation.
See details
|
Bureau of Land Management | 3/18/2010 |
PREMIER DATA SERVICES, INC | $528,940 |
This Bureau of Land Management (BLM), Colorado State Office, American Recovery and Reinvestment Act (ARRA) task will improve the quality for GCDB, LR2000 and MTP data. The result of this work will increase the spatial accuracy of GCDB, thereby giving BLM
This spending item is part of a $644,440 allocation.
See details
|
Bureau of Land Management | 3/15/2010 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $510,057 | Construction Scheduling services to be provided in the National Park Service DSC offices in Lakewood, CO. | National Park Service | 5/13/2010 |
PREMIER DATA SERVICES, INC | $498,916 | Under the American Recovery and Reinvestment Act (ARRA), the Bureau of Land Management (BLM) received funding to be used in Fiscal Years 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage infrastructure investmen | Bureau of Land Management | 10/30/2009 |
MACTEC ENGINEERING AND CONSULTING, INC. | $493,613 |
ARCHITECTURAL & ENGINEERING DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENT SERVICES FOR THE FURNACE CREEK-DEATH VALLEY VISITOR CENTER REHABILITATION PROJECT, LOCATED AT DEATH VALLEY NATIONAL PARK, CA.
This spending item is part of a $809,281 allocation.
See details
|
National Park Service | 1/29/2010 |
METCALF ARCHAEOLOGICAL CONSULTANTS, INC. | $492,354 |
National Historic Trails Inventory
This spending item is part of a $2,289,803 allocation.
See details
|
Bureau of Land Management | 5/14/2010 |
APSI CONSTRUCTION MANAGEMENT | $468,519 | Provide Construction Management as Agent (CMa)services for the National Park Services. 1. Pinnacles National Monument (San Benito County, CA) a. 100% Construction Documents due from contractor October 8, 2010. After review, anticipate mid-November const | National Park Service | 6/01/2010 |
PREMIER DATA SERVICES, INC | $444,394 |
This work will provide support services to the New Mexico BLM to enhance the positional accuracy of the Geographic Coordinate Data Base (GCDB) to ensure positional mapping accuracy of records and boundaries in support of renewable energy development. The
This spending item is part of a $505,594 allocation.
See details
|
Bureau of Land Management | 3/30/2010 |
JACOBS TECHNOLOGY INC. | $443,034 | NATIONAL PARK SERVICE, DENVER SERVICES DIVISION - Construction Management Support Services for ARRA Funded Projects Provide a Senior Construction Manager (Sr. CM) to provide guidance to NPS, DSC project teams on construction issues to enhance the quality | National Park Service | 6/02/2010 |
HDR ENGINEERING, INC. | $417,739 |
Provide Connstruction Management Services for Abandoned Mine Lands (AML) for 9 Pacific West Region Parks: Mojave National Preserve, Death Valley National Park, Joshua Tree National Park, Mount Rainer National Park, Olympic National Park, Lake Mead Nation
This spending item is part of a $458,278 allocation.
See details
|
National Park Service | 5/10/2010 |
PREMIER DATA SERVICES, INC | $412,796 | The Bureau of Land Management (BLM) maintains vital records of public land ownership in Arizona in the form of Control Document Index (CDI) aperture cards. The BLM Arizona State Office has only one set of these aging microfilm aperture cards that are cumb | Bureau of Land Management | 2/05/2010 |
HDR ENGINEERING, INC. | $406,664 | Provide a full-time senior cost estimator to support the in-house staff at the National Park Service, Denver Service Center, for two years. | National Park Service | 5/25/2010 |
MCDONOUGH BOLYARD PECK, INC. | $404,949 | Assist project teams in managing NPS construction projects such as providing guidance to enhance quality and timely delivery; evaluate existing project documents for constructability issues; participate in weekly progress meetings; provide scope requireme | National Park Service | 6/02/2010 |
PREMIER DATA SERVICES, INC | $383,375 |
Under the American Recovery and Reinvestment Act (ARRA), Wyoming BLM has been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. The contactor is providing cadastral data development and
This spending item is part of a $487,258 allocation.
See details
|
Bureau of Land Management | 12/16/2009 |
PREMIER DATA SERVICES, INC | $379,069 |
Under the American Recovery and Reinvestment Act (ARRA), the Bureau of Land Management (BLM) received funding to be used in Fiscal Years 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage infastructure investment
This spending item is part of a $653,869 allocation.
See details
|
Bureau of Land Management | 3/18/2010 |
PREMIER DATA SERVICES, INC | $376,558 | The Bureau of Land Management (BLM) maintains vital records of public land ownership in New Mexico in the form of Control Document Index (CDI) aperture cards. The BLM New Mexico State Office has only one set of these aging microfilm aperture cards that a | Bureau of Land Management | 8/30/2010 |
FACILITY ENGINEERING ASSOCIATES, P.C. | $365,700 | The primary duties of the Energy Audit Contractor shall be the furnishing of all services, labor, equipment and materials, and perform all necessary travel required to conduct energy and water related assessments and services in the region. The energy an | National Park Service | 2/25/2010 |
PLANET TECHNOLOGIES, INC | $359,280 | Sharepoint Administration, Sharepoint Development and user support for Sharepoint products | National Park Service | 9/16/2010 |
FRANKIE FRIEND & ASSOCIATES, INC. | $339,393 | Finance and Accounting Support Services. | Bureau of Land Management | 7/01/2010 |
Arvada Excavating Co | $333,092 |
ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE
This spending item is part of a $3,354,562 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/12/2010 |
NATIVE AMERICAN CONSTRUCTION TRAINING MANAGEMENT, INC. | $276,921 | Road Maintenance_Indian Roads Quarters renovation project. | Indian Affairs (Assistant Secretary) | 11/18/2010 |
ALPHA-BOULDER LIMITED LIABILITY COMPANY | $276,184 | ARRA Program Management -- overseeing various infrastructure projects through completion. | U.S. Fish and Wildlife Service | 7/06/2009 |
PREMIER DATA SERVICES, INC | $260,601 |
Under the American Recovery and Reinvestment Act (ARRA) of 2009, the New Mexico BLM bas been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. The Bureau of Land Management has been comp
This spending item is part of a $590,136 allocation.
See details
|
Bureau of Land Management | 1/11/2010 |
PREMIER DATA SERVICES, INC | $257,007 |
This proposed project is in support of renewable energy exploration and development of wind, solar, geothermal and electrical transmission line resources on Bureau of Land Management administered public land. It is an effort to upgrade and produce these r
This spending item is part of a $351,051 allocation.
See details
|
Bureau of Land Management | 3/29/2010 |
PREMIER DATA SERVICES, INC | $255,686 | The Bureau of Land Management has been compiling survey information and GPS positions to accurately portray the Public Land Survey System in support of parcel based recording, analysis and display of geographic information. This information called the Geo | Bureau of Land Management | 3/29/2010 |
PREMIER DATA SERVICES, INC | $244,238 | The Bureau of Land Management has been compiling survey, title, and legal land description infornlation to accurately portray the Public Land Survey System (PLSS) and title information in support of parcel based display of geographic information. The Geog | Bureau of Land Management | 3/15/2010 |
Martin/Martin, Inc. | $242,109 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $382,648 allocation.
See details
|
National Park Service | 7/20/2009 |
LS GALLEGOS & ASSOCIATES INC | $231,110 | Procurement Assistants, processing invoices Final - total invoiced $231,109.86. contract deobligated to $231,109.86 | National Park Service | 8/13/2010 |
PREMIER DATA SERVICES, INC | $224,225 | The Bureau of Land Management (BLM) has been compiling survey information and Global Positioning System (GPS) positions on survey monuments to accurately portray the Public Land Survey System (PLSS) in support of parcel based recording, analysis and displ | Bureau of Land Management | 3/30/2010 |
RMC CONSULTANTS, INC. | $210,325 | TAS::14 1041::TAS RECOVERY WASO(NO PMIS NUMBER) TO PROVIDE TWO (2) FULL-TIME PERSONNEL TO PERFORM EXTERNAL ENVIRONMENTAL PROJECT REVIEW SERVICES AND NEPA ARRA REPORTING SERVICES AT THE NATIONAL PARK SERVICE (NPS) ENVIRONMENTAL QUALITY DIVISION (EQD), NATI | National Park Service | 9/09/2009 |
ENVIROTEMPS, INC. | $207,447 | Procurement Services | National Park Service | 8/12/2010 |
PREMIER DATA SERVICES, INC | $202,484 | The New Mexico State Office records management program, and the Carlsbad; Farmington, Las Cruces and Roswell Field Ofice renewable energy leasing efforts, necessitates the verification and validation of all land and mineral record data in the 1266 targete | Bureau of Land Management | 3/18/2010 |
SPANO, CHRISTOPHER | $198,475 | Validate and Upgrade Protracted Townships: Validate all protracted or partially protracted townships that meet the criteria stated in the overview of this document. This will include Amended Protraction Diagrams (APD). An initial query of the BLM?s Geo | Bureau of Land Management | 1/22/2010 |
PREMIER DATA SERVICES, INC | $195,841 | Under the American Recovery and Reinvestment Act (ARRA) of 2009, New Mexico BLM has been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. An export of ? Solar Energy Study Sites, ? Au | Bureau of Land Management | 1/07/2010 |
HDR ENGINEERING, INC. | $192,398 | Provide support services to promote migration of project specific construction eletronic and hardcopy information, files, and documents into DSC's new Sharepoint Construction website. | National Park Service | 9/08/2010 |
HDR ENGINEERING, INC. | $192,398 | Provide support services to promote migration of project specific construction eletronic and hardcopy information, files, and documents into DSC's new Sharepoint Construction website. | National Park Service | 9/08/2010 |
FRANKIE FRIEND & ASSOCIATES, INC. | $157,143 | Contract Specialist support services. | U.S. Fish and Wildlife Service | 5/12/2010 |
PREMIER DATA SERVICES, INC | $152,167 |
Of the over 5,000 townships in both Oregon and Washington, contracted work on 2874 townships are eligible for ARRA funding. This contract award addresses post scanning support tasks required in ARRA townships to provide the indexed and accessible digital
This spending item is part of a $893,067 allocation.
See details
|
Bureau of Land Management | 12/16/2009 |
SUN SPOT SOLAR, LLC | $140,000 |
Rehabilitate Office/Visitor Center at Quivira NWR KS
This spending item is part of a $710,883 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/25/2010 |
LOUIS BERGER GROUP, INC., THE | $129,041 | In accordance with the terms and conditions of the Indefinite Delivery/Indefinate Quantity (IDIQ) Contract the Contractor shall perform the work of this task for the National Park Service (NPS) as described. The work consists of preparing a draft Environm | National Park Service | 6/15/2009 |
MDL INNOVATIVE SERVICES INCORPORATED | $121,382 | Administrative Management & General Management Consulting Services | National Park Service | 9/13/2010 |
EGS INC. | $120,000 | Contracting Officer Support | Bureau of Land Management | 6/28/2010 |
EGS INC. | $120,000 | Provide non personal services of a contract specialist to acquisition branch of BLM. Requires extensive knowldge of pre-award effort, post award admin. and contract closeout | Bureau of Land Management | 7/01/2010 |
IRVING BURTON ASSOCIATES, INC. | $114,325 | Provide Contract Support Specialist II Services for the WASO WCP Office. | National Park Service | 9/21/2010 |
PREMIER DATA SERVICES, INC | $111,039 | The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM's official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingto | Bureau of Land Management | 3/25/2010 |
PREMIER DATA SERVICES, INC | $107,125 |
Provide support to the Bureau of Land Management (BLM), Oregon State Office (ORSO), Branch of Geographic Sciences, in consultation with the Branch of Land and Mineral Resources, for the update and maintenance of BLMG??s official title, land and mineral re
This spending item is part of a $186,270 allocation.
See details
|
Bureau of Land Management | 12/16/2009 |
PRECISION RECRUITING, INC | $103,000 | Provide administrative support to contracting officers and managers who are processing ARRA funded projects. Telephone and written communication with vendors for these projects. Procurement Technician for computer, radio and relocation expenses. Clos | U.S. Fish and Wildlife Service | 8/10/2010 |
NUAXIS LLC | $101,182 | NuAxis is fulfilling the NPS OCIO NISC's requirement for a help desk technician. | National Park Service | 9/24/2010 |
LOUIS BERGER GROUP, INC., THE | $99,233 |
Environmental Assessment at Golden Gate National Recreation Area (Alcatraz Island) evaluating installating a submarine cable in SF Bay and putting photovolatic panels on buildings on Alcatraz Island to remove the island from diesel generation as a primary
This spending item is part of a $134,918 allocation.
See details
|
National Park Service | 7/29/2009 |
R M H GROUP, INC., THE | $98,154 |
Planning, Design, and Engineering services for the Kanab Visitors Center.
This spending item is part of a $571,269 allocation.
See details
|
Bureau of Land Management | 8/31/2009 |
PREMIER DATA SERVICES, INC | $95,980 | The Bureau of Land Management has been compiling survey information and GPS positions to accurately portray the Public Land Survey System in support of parcel based recording, analysis and display of geographic information. This information is called the | Bureau of Land Management | 3/26/2010 |
FACILITY ENGINEERING ASSOCIATES, P.C. | $85,300 | The primary duties of the Energy Audit Contractor shall be the furnishing of all services, labor, equipment and materials, and perform all necessary travel required to conduct energy and water related assessments and services for the National Park Service | National Park Service | 2/23/2010 |
PREMIER DATA SERVICES, INC | $84,420 | The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM?s official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingt | Bureau of Land Management | 3/25/2010 |
RED RIVER COMPUTER CO., INC. | $83,862 | SUN ADP EQUIPMENT - SERVER & CONTROLLER | Geological Survey | 5/06/2010 |
PRECISION RECRUITING, INC | $82,598 | Administrative Support and Oversight. Working on administering the current ARRA agreements. I also contact ARRA project officers to retrieve reports for these agreements. | U.S. Fish and Wildlife Service | 3/09/2010 |
PREMIER DATA SERVICES, INC | $80,118 | The Bureau of Land Management has been compiling survey information and GPS positions to accurately portray the Public Land Survey System (PLSS) in support of parcel based recording, analysis and display of geographic information. This information is call | Bureau of Land Management | 3/26/2010 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $77,609 | Cost Estimating Quality Assurance at Denver Service Center. Provide quality assrance reviews and construction cost estimates submitted to the DSC by A/E firms at major project milestons (i.e. predesign, schematic design, design development and construct | National Park Service | 1/13/2010 |
RED RIVER COMPUTER CO., INC. | $74,892 | Sun Equipment and Maint. | Geological Survey | 9/23/2009 |
MARTIN/MARTIN, INC. | $72,277 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $80,280 allocation.
See details
|
National Park Service | 5/06/2010 |
LOUIS BERGER GROUP, INC., THE | $70,527 | The contractor will inventory (via NAIP 2009 aerial photography or GPS) and conduct field verification of the existing routes (rountes demonstrating some level of motorized use, current or historical) within the WRFO. The contractor will incorporate all v | Bureau of Land Management | 5/24/2010 |
PREMIER DATA SERVICES, INC | $69,053 |
The purpose of this task addition is to increase the number of contract employees to facilitate the completion of the Control Document Index (CDI) support under the original (Non-ARRA) task order. Approximately 330,000 cards will be scanned and indexed
This spending item is part of a $282,819 allocation.
See details
|
Bureau of Land Management | 8/26/2010 |
LOUIS BERGER GROUP, INC., THE | $69,030 | Big South Fork National River and recreation Area PMIS 152731. Environmental Assessment and Wetland delineation for the closure of 53 Hazardous Abandoned Oil and Gas Wells. | National Park Service | 9/08/2009 |
R M H GROUP, INC., THE | $60,796 |
This project will serve to rehabilitate the Many Glacier Hotel in Glacier National Park, MT. The hotel is in an advanced state of deterioration and requires immediate rehabilitation to address critical health and life-safety needs and comply with buildin
This spending item is part of a $251,003 allocation.
See details
|
National Park Service | 6/30/2010 |
LS GALLEGOS & ASSOCIATES INC | $56,736 | Contract Administration | National Park Service | 8/16/2010 |
LS GALLEGOS & ASSOCIATES INC | $56,736 | Contract Administration | National Park Service | 8/16/2010 |
ARCADIS U.S., INC. | $56,588 |
Technical Narrative for Longfellow Mill Site EE/CA and HERA, Tuolumne County, CA
This spending item is part of a $203,971 allocation.
See details
|
Bureau of Land Management | 7/06/2010 |
R M H GROUP, INC., THE | $50,740 |
Yosemite National Park, CA - Title I A/E Preliminary design services for Solar Equipment at El Portal Complex
This spending item is part of a $124,065 allocation.
See details
|
National Park Service | 10/16/2009 |
IRVING BURTON ASSOCIATES, INC. | $49,257 | This action for a Procurement Technician/Analyst which will support the quality control of FPDS-NG Recovery Act action iaw sow. | National Park Service | 6/09/2010 |
R M H GROUP, INC., THE | $49,154 |
The Quarry Visitor Center (QVC) was constructed in 1956-57 to protect and provide visitor access and interpretation of the greatest quarry of Jurassic dinosaurs in the world. The QVC was closed in 2006 after a condition assessment identified some previou
This spending item is part of a $252,410 allocation.
See details
|
National Park Service | 3/14/2010 |
R M H GROUP, INC., THE | $49,082 |
Farmington Title III Construction RFI responses.
This spending item is part of a $454,811 allocation.
See details
|
Bureau of Land Management | 5/03/2010 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $47,943 |
Electrical Engineering Quality Assurance Services. Time-frame: Approx January 4, 2010 through 9/30/2012. Work is full-time to part-time as required. The Denver Service Center , Technical 'Branch of the Design and construction division performs quality
This spending item is part of a $94,743 allocation.
See details
|
National Park Service | 1/13/2010 |
R M H GROUP, INC., THE | $45,169 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $382,648 allocation.
See details
|
National Park Service | 7/20/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $42,405 |
Title III A/E Construction Management Services Task Order for Solar Equipment at El Portal Complex, Yosemite National Park
This spending item is part of a $67,546 allocation.
See details
|
National Park Service | 5/13/2010 |
RICHARD P. ARBER ASSOCIATES, INC. | $42,335 |
Yosemite National Park, CA - Title I A/E Preliminary design services for Solar Equipment at El Portal Complex
This spending item is part of a $124,065 allocation.
See details
|
National Park Service | 10/16/2009 |
R M H GROUP, INC., THE | $40,884 |
Construction Administration, construction observation, and LEED Commissioning of the Kanab Office Building, Kanab, UT
This spending item is part of a $338,817 allocation.
See details
|
Bureau of Land Management | 8/27/2010 |
Merrill Ann Wilson Historical | $40,539 |
Provide Connstruction Management Services for Abandoned Mine Lands (AML) for 9 Pacific West Region Parks: Mojave National Preserve, Death Valley National Park, Joshua Tree National Park, Mount Rainer National Park, Olympic National Park, Lake Mead Nation
This spending item is part of a $458,278 allocation.
See details
|
National Park Service | 5/10/2010 |
TLI SOLUTIONS, INC. | $39,004 | Professional Technical Support to BLM to identify PRPs for the Ruth and Darwin Mines located in Inyo County, CA. | Bureau of Land Management | 3/12/2010 |
PREMIER DATA SERVICES, INC | $37,381 | The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM's official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingto | Bureau of Land Management | 3/25/2010 |
NORSEMAN, INC. | $37,345 | 3 Phase Uninterpretable power supply | Geological Survey | 3/31/2010 |
FACILITY ENGINEERING ASSOCIATES, P.C. | $37,200 | The primary duties of the Energy Audit Contractor shall be the furnishing of all services, labor, equipment and materials, and perform all necessary travel required to conduct energy and water related assessments and services for the National Park Service | National Park Service | 2/23/2010 |
ENGINEERING ECONOMICS, INC. | $35,072 | Furnishing Labor, supplies,personnel, materials, equipment and supervision to provide Commission Agent Services for the Construction Project of Repairs/Renovations at the Nenahnezad Community School in Fruitland New Mexico | Indian Affairs (Assistant Secretary) | 5/11/2010 |
TELECOM SYSTEM SOLUTIONS INC | $28,802 | Upgrade of existing Meridian 1 Opt-11C PBX from software rel 3.0 to rel 6.0. This includes adding additional hardware to accommodate future growth on the PBX. An additional equipment shelf is being added which gives NPS the ability to add up to 256 additi | National Park Service | 3/11/2010 |
TELECOM SYSTEM SOLUTIONS INC | $28,802 | National Park Service (NPS) ON-GOING MAINTENANCE CONTRACT FOR PBX'S | National Park Service | 3/11/2010 |
TLI SOLUTIONS, INC. | $28,593 |
The purpose of this project is to conduct a Removal Site Investigation (RSI). The overall purpose of the RSI is to determine the presence and extent of heavy metal contamination in a portion of Deer Creek, located in Nevada County, CA. The specific object
This spending item is part of a $47,718 allocation.
See details
|
Bureau of Land Management | 2/23/2010 |
DIRECTNET, INC. | $25,726 | 42U will provide racks and filler panels for the USGS data center located in the Federal Center in Lakewood, CO. The racks provide a secure and organized storage location for IT and networking equipment. In addition, the racks and filler panels allow US | Geological Survey | 3/16/2010 |
R M H GROUP, INC., THE | $25,141 |
Title III A/E Construction Management Services Task Order for Solar Equipment at El Portal Complex, Yosemite National Park
This spending item is part of a $67,546 allocation.
See details
|
National Park Service | 5/13/2010 |
ANDREWS AND ANDERSON ARCHITECT PC | $24,389 |
Jupiter Inlet Light House.
This spending item is part of a $36,014 allocation.
See details
|
Bureau of Land Management | 2/03/2010 |
ANDREWS AND ANDERSON ARCHITECT PC | $24,389 |
Jupiter Inlet Light House.
This spending item is part of a $36,014 allocation.
See details
|
Bureau of Land Management | 2/03/2010 |
PREMIER DATA SERVICES, INC | $23,681 | Under the American Recovery and Reinvestment Act (ARRA) of 2009, the Arizona State Office of the Bureau of Land Management (BLM) has been tasked with ensuring positional mapping accuracy of land records and boundaries in support of renewable energy develo | Bureau of Land Management | 12/17/2009 |
TEAM HENRY ENTERPRISES, LLC | $22,642 |
Demolition of streamgages and cableways.
This spending item is part of a $34,514 allocation.
See details
|
Geological Survey | 3/04/2010 |
TEKNION, LLC. | $22,395 | Office Furniture | Office of the Inspector General | 7/02/2009 |
PREMIER DATA SERVICES, INC | $21,200 | The purpose of the contract is to provide contract support to the Bureau of Land Management (BLM), Oregon State Office (ORSO), Branch of Geographic Sciences, for creating official plats of survey. A Cartographic Technician/Draftsman is being provided to | Bureau of Land Management | 12/17/2009 |
SANITY SOLUTIONS, INC. | $20,947 | Purchase of (4) Xiotech Bay Upgrades, (1) Fibre Channel Enterprise Drive, (1) Storage Bay IV for Magnitude 3D 3X00 and 4000 Systems, (1) Datascale Capacity Manager Upgrade (44.4TB to 49.2TB), (1) Professional Services installation. To upgrade computer sy | National Park Service | 12/22/2009 |
Pate Concrete Contractors Inc | $19,248 |
ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE
This spending item is part of a $3,354,562 allocation.
See details
|
U.S. Fish and Wildlife Service | 8/12/2010 |
TEAM HENRY ENTERPRISES, LLC | $15,450 |
Demolition of streamgages and cableways.
This spending item is part of a $23,076 allocation.
See details
|
Geological Survey | 3/05/2010 |
R M H GROUP, INC., THE | $15,282 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $80,280 allocation.
See details
|
National Park Service | 5/06/2010 |
GENESIS CONSTRUCTION INC | $15,160 |
KREMLING BUNKHOUSE
This spending item is part of a $585,754 allocation.
See details
|
U.S. Fish and Wildlife Service | 6/22/2010 |
ENVIROTEMPS, INC. | $15,000 | Roofing Services | National Park Service | 10/26/2009 |
QUANTUM PM LLC | $14,241 | Provided subject matter expert to prepare written materials to share with NPS developer. Met with NPS Developer to transfer knowledge necessary to maintain the Panorama Dashboard application. Knowledge transfer included internal meetings for organization | National Park Service | 8/18/2009 |
ENVIROTEMPS, INC. | $14,219 | Roofing Services | National Park Service | 5/03/2010 |
APPLIED POWER SERVICES LLC | $13,258 | Award is for battery backup power for Northern Telecom Option 11C - National Park Service - located at 12795 W. Alameda Pkwy - Lakewood, CO. install (24) 12V-100AH Liberty batteries and (8) 10V-100AH Liberty Series 1000 by C&D. | National Park Service | 2/22/2010 |
THUNDER DISASTER SERVICES, INC. | $11,872 |
Demolition of streamgages and cableways.
This spending item is part of a $34,514 allocation.
See details
|
Geological Survey | 3/04/2010 |
YEH AND ASSOCIATES, INC | $11,625 |
Jupiter Inlet Light House.
This spending item is part of a $36,014 allocation.
See details
|
Bureau of Land Management | 2/03/2010 |
R M H GROUP, INC., THE | $11,350 |
Lake Mead National Recreation Area, Nevada - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Boulder City Maintenance Warehouse Complex
This spending item is part of a $20,367 allocation.
See details
|
National Park Service | 8/24/2009 |
SCANDALIATO DESIGN GROUP INC. | $10,560 |
This project will serve to rehabilitate the Many Glacier Hotel in Glacier National Park, MT. The hotel is in an advanced state of deterioration and requires immediate rehabilitation to address critical health and life-safety needs and comply with buildin
This spending item is part of a $251,003 allocation.
See details
|
National Park Service | 6/30/2010 |
SCANDALIATO DESIGN GROUP INC. | $9,378 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $382,648 allocation.
See details
|
National Park Service | 7/20/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $9,017 |
Lake Mead National Recreation Area, Nevada - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Boulder City Maintenance Warehouse Complex
This spending item is part of a $20,367 allocation.
See details
|
National Park Service | 8/24/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $8,699 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Installation of Photovoltaic System at Park Headquarters Building
This spending item is part of a $10,849 allocation.
See details
|
National Park Service | 12/23/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $7,881 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Installation of Photovoltaic System at Ft. Spokane Shop and Office Building
This spending item is part of a $10,031 allocation.
See details
|
National Park Service | 12/23/2009 |
THUNDER DISASTER SERVICES, INC. | $7,627 |
Demolition of streamgages and cableways.
This spending item is part of a $23,076 allocation.
See details
|
Geological Survey | 3/05/2010 |
R M H GROUP, INC., THE | $6,725 |
Death Valley National Park - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Cow Creek Maintenance Comples
This spending item is part of a $13,318 allocation.
See details
|
National Park Service | 8/24/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $6,723 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Performing a Energy Retrofit of Fort Spokane and Kettle Falls Buildings
This spending item is part of a $8,873 allocation.
See details
|
National Park Service | 1/26/2010 |
RICHARD P. ARBER ASSOCIATES, INC. | $6,593 |
Death Valley National Park - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Cow Creek Maintenance Comples
This spending item is part of a $13,318 allocation.
See details
|
National Park Service | 8/24/2009 |
ENVIROTEMPS, INC. | $6,183 | Roofing Specialist | National Park Service | 6/03/2010 |
RICHARD P. ARBER ASSOCIATES, INC. | $5,856 |
Golden Gate National Recreation Area - Title I Preliminary Design Services for Installation of Photovoltaic System at Building 201, Headquarters, Fort Mason, San Francisco, CA
This spending item is part of a $7,856 allocation.
See details
|
National Park Service | 8/11/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $4,842 |
Manzanar National Historic Site, CA - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Visitor Center Auditorium
This spending item is part of a $8,892 allocation.
See details
|
National Park Service | 8/24/2009 |
DLT SOLUTIONS, LLC | $4,561 | Software Subscription and Licences | Bureau of Land Management | 7/31/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $4,383 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Installation of Grid Connected Micro-hydro Power System At Fort Spokane Water System
This spending item is part of a $6,533 allocation.
See details
|
National Park Service | 1/28/2010 |
RICHARD P. ARBER ASSOCIATES, INC. | $4,291 |
Redwood National Park, CA -Title I Preliminary Design Services for Installation of Photovoltaic System at Headquarter/Visitor Center
This spending item is part of a $5,941 allocation.
See details
|
National Park Service | 8/11/2009 |
TEKNION, LLC. | $4,095 | Office Furniture | Office of the Inspector General | 9/21/2009 |
R M H GROUP, INC., THE | $4,050 |
Manzanar National Historic Site, CA - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Visitor Center Auditorium
This spending item is part of a $8,892 allocation.
See details
|
National Park Service | 8/24/2009 |
ENVIROTEMPS, INC. | $3,343 | Roofing Repais and Maintenance Support | National Park Service | 2/02/2010 |
COUNTERTRADE PRODUCTS, INC. | $2,984 | Maxmind Software updates | U.S. Fish and Wildlife Service | 8/06/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $2,813 |
Point Reyes National Seashore, CA - Title 1 - Preliminary Design Services for Installation of Photovoltaic Systems at Youth Hostel, Drakes Beach and Morgan Horse Ranch
This spending item is part of a $5,213 allocation.
See details
|
National Park Service | 8/10/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $2,632 |
Channel Islands National Park, California - Title I Preliminary Design Services for Installation of Photovoltaic System at Park Headquarters
This spending item is part of a $4,782 allocation.
See details
|
National Park Service | 8/19/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $2,532 |
Santa Monica Mountains National Recreation Area, CA -Title I Preliminary Design Services for Installation of Photovoltaic Systems at Diamond X Ranch and Paramount Ranch
This spending item is part of a $4,932 allocation.
See details
|
National Park Service | 8/19/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $2,497 |
Santa Monica Mountains National Recreation Area, CA -Title I Preliminary Design Services for Installation of Photovoltaic Systems at Three Park Buildings
This spending item is part of a $4,897 allocation.
See details
|
National Park Service | 8/19/2009 |
R M H GROUP, INC., THE | $2,400 |
Point Reyes National Seashore, CA - Title 1 - Preliminary Design Services for Installation of Photovoltaic Systems at Youth Hostel, Drakes Beach and Morgan Horse Ranch
This spending item is part of a $5,213 allocation.
See details
|
National Park Service | 8/10/2009 |
R M H GROUP, INC., THE | $2,400 |
Santa Monica Mountains National Recreation Area, CA -Title I Preliminary Design Services for Installation of Photovoltaic Systems at Diamond X Ranch and Paramount Ranch
This spending item is part of a $4,932 allocation.
See details
|
National Park Service | 8/19/2009 |
R M H GROUP, INC., THE | $2,400 |
Santa Monica Mountains National Recreation Area, CA -Title I Preliminary Design Services for Installation of Photovoltaic Systems at Three Park Buildings
This spending item is part of a $4,897 allocation.
See details
|
National Park Service | 8/19/2009 |
R M H GROUP, INC., THE | $2,400 |
Santa Monica Mountains National Recreation Area, CA - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Circle X Ranch
This spending item is part of a $4,799 allocation.
See details
|
National Park Service | 8/19/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $2,399 |
Santa Monica Mountains National Recreation Area, CA - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Circle X Ranch
This spending item is part of a $4,799 allocation.
See details
|
National Park Service | 8/19/2009 |
R M H GROUP, INC., THE | $2,150 |
Channel Islands National Park, California - Title I Preliminary Design Services for Installation of Photovoltaic System at Park Headquarters
This spending item is part of a $4,782 allocation.
See details
|
National Park Service | 8/19/2009 |
R M H GROUP, INC., THE | $2,150 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Installation of Grid Connected Micro-hydro Power System At Fort Spokane Water System
This spending item is part of a $6,533 allocation.
See details
|
National Park Service | 1/28/2010 |
R M H GROUP, INC., THE | $2,150 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Performing a Energy Retrofit of Fort Spokane and Kettle Falls Buildings
This spending item is part of a $8,873 allocation.
See details
|
National Park Service | 1/26/2010 |
R M H GROUP, INC., THE | $2,150 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Installation of Photovoltaic System at Park Headquarters Building
This spending item is part of a $10,849 allocation.
See details
|
National Park Service | 12/23/2009 |
R M H GROUP, INC., THE | $2,150 |
Lake Rossevelt National Recreation Area, Washington - Title I Preliminary Design Services for Installation of Photovoltaic System at Ft. Spokane Shop and Office Building
This spending item is part of a $10,031 allocation.
See details
|
National Park Service | 12/23/2009 |
R M H GROUP, INC., THE | $2,050 |
Point Reyes National Seashore, CA - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Resource Management Building, B&U Shop and Gallagher Wellhouse
This spending item is part of a $3,774 allocation.
See details
|
National Park Service | 8/11/2009 |
R M H GROUP, INC., THE | $2,000 |
Golden Gate National Recreation Area - Title I Preliminary Design Services for Installation of Photovoltaic System at Building 201, Headquarters, Fort Mason, San Francisco, CA
This spending item is part of a $7,856 allocation.
See details
|
National Park Service | 8/11/2009 |
SCANDALIATO DESIGN GROUP INC. | $1,847 |
The Quarry Visitor Center (QVC) was constructed in 1956-57 to protect and provide visitor access and interpretation of the greatest quarry of Jurassic dinosaurs in the world. The QVC was closed in 2006 after a condition assessment identified some previou
This spending item is part of a $252,410 allocation.
See details
|
National Park Service | 3/14/2010 |
R M H GROUP, INC., THE | $1,800 |
Point Reyes National Sheashore, CA - Title I Preliminary Design Services for Installation of a Photovoltaic System at the Bolinas RCA Building
This spending item is part of a $3,425 allocation.
See details
|
National Park Service | 8/11/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $1,724 |
Point Reyes National Seashore, CA - Title I Preliminary Design Services for Installation of Photovoltaic Systems at Resource Management Building, B&U Shop and Gallagher Wellhouse
This spending item is part of a $3,774 allocation.
See details
|
National Park Service | 8/11/2009 |
R M H GROUP, INC., THE | $1,650 |
Redwood National Park, CA -Title I Preliminary Design Services for Installation of Photovoltaic System at Headquarter/Visitor Center
This spending item is part of a $5,941 allocation.
See details
|
National Park Service | 8/11/2009 |
RICHARD P. ARBER ASSOCIATES, INC. | $1,625 |
Point Reyes National Sheashore, CA - Title I Preliminary Design Services for Installation of a Photovoltaic System at the Bolinas RCA Building
This spending item is part of a $3,425 allocation.
See details
|
National Park Service | 8/11/2009 |
Martin/Martin, Inc. | $1,354 |
This project consisted of an onsite Design Charette for Juniper Campground at Bandelier National Monument in New Mexico. Members from the A/E team travelled to the site to conduct the meeting in which discussions were held and to provide analysis of the
This spending item is part of a $41,043 allocation.
See details
|
National Park Service | 9/04/2009 |
YEH AND ASSOCIATES, INC | $1,019 |
Site analysis planning and design of two comfort stations and a maintenance building at the Boquillas Ranch Complex.
This spending item is part of a $28,974 allocation.
See details
|
Bureau of Land Management | 12/03/2009 |
SCANDALIATO DESIGN GROUP INC. | $669 |
This project will rehabilitate the failing potable water storage and distribution system and provide adequate fire protection at the Ash Mountain Headquarters and housing area in Sequoia National Park. This project will also replace one 100,000 and one 5
This spending item is part of a $80,280 allocation.
See details
|
National Park Service | 5/06/2010 |
R M H GROUP, INC., THE | $417 |
This project consisted of an onsite Design Charette for Juniper Campground at Bandelier National Monument in New Mexico. Members from the A/E team travelled to the site to conduct the meeting in which discussions were held and to provide analysis of the
This spending item is part of a $41,043 allocation.
See details
|
National Park Service | 9/04/2009 |
YEH AND ASSOCIATES, INC | $0 |
Jupiter Inlet Light House.
This spending item is part of a $36,014 allocation.
See details
|
Bureau of Land Management | 2/03/2010 |