Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Clark County, Nev., funds by Interior, Department of

Listing $24,151,385.71 in stimulus funds from Interior, Department of for Clark

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
WHITING-TURNER CONTRACTING COMPANY, THE $17,811,044 Overall purpose of this contract is to provide a Desing Build, LEED Platinum Certified offcie building for the Lower Colorado Division of the Burea of Reclamation in Boulder City, NV. Expected outcome would be to provide a quality office building meetin Bureau of Reclamation 4/08/2010
RAFAEL CONSTRUCTION, INC. $1,582,048 Recovery-0+00 Wastewater/Wasteway and Diversion Structure, Yuma Area Office, Yuma Arizona Bureau of Reclamation 2/27/2010
MDU RESOURCES GROUP, INC. $656,748 Extend utilities to and within the site, construct solar photovoltaic power generation and distribution systems at Nevada Solar Power Facilities.
This spending item is part of a $1,165,887 allocation. See details
U.S. Fish and Wildlife Service 7/22/2010
HELIX ELECTRIC OF NEVADA, LLC $286,206 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
C3 LIMITED LIABILITY COMPANY $268,139 Extend utilities to and within the site, construct solar photovoltaic power generation and distribution systems at Nevada Solar Power Facilities.
This spending item is part of a $1,165,887 allocation. See details
U.S. Fish and Wildlife Service 7/22/2010
J & J ENTERPRISES SERVICES, INC. $247,858 Pothole patching , installing and replacing signs, culvert cleaning crackfill Indian Affairs (Assistant Secretary) 6/18/2010
Shoreline Electric Inc $241,300 The project for the National Park Service at the Lake Mead National Recreation Area is being completed per CLIN 3 and 4 of the contract documents including changes received in contract modifications. United Construction will construct the Northern and Sou
This spending item is part of a $379,677 allocation. See details
National Park Service 5/10/2010
Gallent Enterprise Inc $241,000 Extend utilities to and within the site, construct solar photovoltaic power generation and distribution systems at Nevada Solar Power Facilities.
This spending item is part of a $1,165,887 allocation. See details
U.S. Fish and Wildlife Service 7/22/2010
CARPENTER SELLERS DEL GATTO ARCHITECTS, PC $225,121 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
SOUTHERN NEVADA WATER AUTHORITY $180,000 National Geospatial Program: Building The National Map The project will complete 540 square-miles of high-resolution, color and infrared aerial imagery in the Las Vegas Metropolitan area. These activities will aid efforts to identify new opportunities and approaches to water conservation in the Las ... Show more Geological Survey 2/17/2010
Southern Nevada Water Authority $180,000 U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 Water Smart Landscape Program Orthoimagery Project Geological Survey 2/17/2010
CARPENTER SELLERS DEL GATTO ARCHITECTS, PC $153,902 Architectural and Engineering Services for Solar Power Facilities
This spending item is part of a $392,504 allocation. See details
Bureau of Land Management 12/02/2009
SOUTHWEST AIR CONDITIONING, INC. $150,866 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
Valley Underground, Inc. $140,251 CONSTRUCTION OF MOHAVE DESERT FIRE STATION
This spending item is part of a $718,769 allocation. See details
Bureau of Land Management 6/28/2010
SWCA, INCORPORATED $133,184 Class II & Class III Cultural Inventory Bureau of Land Management 3/22/2010
ADVANTAGE CIVIL DESIGN GROUP, LLP $132,587 Architectural and Engineering Services for Solar Power Facilities
This spending item is part of a $392,504 allocation. See details
Bureau of Land Management 12/02/2009
LAS VEGAS VALLEY WATER DISTRICT $131,330 Intergovernmental personnel assignment to provide contract administration. Bureau of Reclamation 6/10/2010
INTEGRITY ENGINEERING $103,350 On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W
This spending item is part of a $1,315,784 allocation. See details
U.S. Fish and Wildlife Service 5/30/2009
Es2 Las Vegas, LLC $100,940 On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W
This spending item is part of a $1,315,784 allocation. See details
U.S. Fish and Wildlife Service 5/30/2009
UNITED CONSTRUCTION COMPANY $97,541 The project for the National Park Service at the Lake Mead National Recreation Area is being completed per CLIN 3 and 4 of the contract documents including changes received in contract modifications. United Construction will construct the Northern and Sou
This spending item is part of a $379,677 allocation. See details
National Park Service 5/10/2010
REVA MURPHY ASSOCIATES, INC. $83,525 Lake Mead Roofing National Park Service 3/25/2010
NDL GROUP, INC. $79,928 Rehabilitation/replacement of 4 fish cleaning stations at Lake Mead Recreational Area. Contract includes the purchase of 4 cleaning basins, industrial-grade disposals, electrical and plumbing installation on site.
This spending item is part of a $100,451 allocation. See details
National Park Service 4/14/2010
ADVANTAGE CIVIL DESIGN GROUP, LLP $69,633 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
DEKKER/PERICH/SABATINI LTD. $64,500 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
REVA MURPHY ASSOCIATES, INC. $61,253 Boulder Beach Housing Units Roofing National Park Service 1/22/2010
Syska Hennessy Group, Inc $58,207 Architectural and Engineering Services for Solar Power Facilities
This spending item is part of a $392,504 allocation. See details
Bureau of Land Management 12/02/2009
GENTRY EQUIPMENT LLC $57,400 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
Alpine Steel LLC $53,220 CONSTRUCTION OF MOHAVE DESERT FIRE STATION
This spending item is part of a $718,769 allocation. See details
Bureau of Land Management 6/28/2010
Es2 Las Vegas, LLC $41,920 On 11/10/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the Hagerman National
This spending item is part of a $361,199 allocation. See details
U.S. Fish and Wildlife Service 11/10/2009
WRIGHT ENGINEERS, INC. $40,939 Architectural and Engineering Services for Solar Power Facilities
This spending item is part of a $392,504 allocation. See details
Bureau of Land Management 12/02/2009
Silver State Steel Group, Inc $40,836 The project for the National Park Service at the Lake Mead National Recreation Area is being completed per CLIN 3 and 4 of the contract documents including changes received in contract modifications. United Construction will construct the Northern and Sou
This spending item is part of a $379,677 allocation. See details
National Park Service 5/10/2010
THE TIBERTI COMPANY $38,329 Supply Green 1.33 T-Posts 1 LO Bureau of Land Management 9/12/2009
URS GROUP, INC. $38,085 Review of USFWS approved plans, specifications, bid schedules, contractor's submittals, and approved change orders to inspect contractor's work for a new pipeline. Preparation of daily reports, including photographs of site conditions and work progress. C U.S. Fish and Wildlife Service 8/02/2010
TESTMARCX ASSOCIATES, INC. $36,965 Construction Administration, construction observation, and LEED Commissioning of the Kanab Office Building, Kanab, UT
This spending item is part of a $338,817 allocation. See details
Bureau of Land Management 8/27/2010
WRIGHT ENGINEERS, INC. $29,680 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
Ninyo & Moore, Inc $28,437 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
Syska Hennessy Group, Inc $26,256 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
Cte Inc $23,975 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
Henri Specialties Co Inc of Nevada $21,798 KANAB OFFICE BUILDING
This spending item is part of a $7,069,529 allocation. See details
Bureau of Land Management 9/16/2010
LAS VEGAS PAIUTE TRIBE $19,269 Highway Planning and Construction Tribal mgt. and construction activities (Install 5 street lights) on Route 102, Wolf Street Indian Affairs (Assistant Secretary) 5/13/2010
STANTEC CONSULTING SERVICES INC. $18,976 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
MOAPA BAND PAIUTE $16,824 Highway Planning and Construction Labor, materials, equipment and services to construct speed humps, crack cleaning, and sealing, sign instalation and pavement markings for 2.0 miles on route 1. Project ID# H69A0100. Indian Affairs (Assistant Secretary) 5/19/2010
HAYWOOD GROUP LLC $16,271 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
WRIGHT ENGINEERS, INC. $15,973 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
WESTERN STATES FIRE PROTECTION COMPANY INC $15,630 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
U.S. Plumbing, Inc. $12,023 Rehabilitation/replacement of 4 fish cleaning stations at Lake Mead Recreational Area. Contract includes the purchase of 4 cleaning basins, industrial-grade disposals, electrical and plumbing installation on site.
This spending item is part of a $100,451 allocation. See details
National Park Service 4/14/2010
J & J ENTERPRISES SERVICES, INC. $11,867 Crack cleaning and sealing, sign installation and temporary traffic control. Indian Affairs (Assistant Secretary) 9/22/2010
LAS VEGAS PAIUTE TRIBE $11,845 Road Maintenance_Indian Roads Bureau of Indian Affairs Road Repair and Restoration Project Indian Affairs (Assistant Secretary) 3/24/2010
Western Sealants $10,600 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
Floor Seasons $10,400 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
Alcal/Arcade Contracting, Inc. $9,503 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010
MOAPA BAND PAIUTE $8,954 Road Maintenance_Indian Roads Roads Assessment and Repair. Project #H696501H Indian Affairs (Assistant Secretary) 3/24/2010
Pf Electric , Inc $8,500 Rehabilitation/replacement of 4 fish cleaning stations at Lake Mead Recreational Area. Contract includes the purchase of 4 cleaning basins, industrial-grade disposals, electrical and plumbing installation on site.
This spending item is part of a $100,451 allocation. See details
National Park Service 4/14/2010
DIAMONDBACK LAND SURVEYING, LLC $6,450 This project shall design and construct two four bedroom duplexes and one three bedroom triplex, parking, site and utility work, and a grid tied photovoltaic system, complete and ready for use in the Cow Creek Housing Area at Death Valley National Park lo
This spending item is part of a $2,060,649 allocation. See details
National Park Service 2/18/2010