Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Washoe County, Nev., funds by Interior, Department of

Listing $10,994,690.92 in stimulus funds from Interior, Department of for Washoe

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
WEST COAST CONTRACTORS OF NEVADA, INC. $7,368,625 ENVIRONMENTAL DESIGN (LEED) NC VERSION 2009 RATING SYSTEM, AS SPECIFIED . U.S. Fish and Wildlife Service 3/25/2010
PYRAMID LAKE PAIUTE TRIBE $501,113 Road Maintenance_Indian Roads To furnish all labor, materials, equipment, and personnel to perform tribal project management, equipment purchase (i.e., vibratory roller, plate compactor, utility trailer); route assessments on 138.5 miles of roadways; safety improvements (i.e., pothole Indian Affairs (Assistant Secretary) 3/23/2010
UNIVERSITY OF NEVADA, RENO $492,000 Fish, Wildlife and Plant Conservation Resource Management Bootstraps is a job creation, life skills and natural resource enhancement program designed to teach life/job skills to young men and women ages 18-25, not working and not in school. Natural Resource project work is centered upon sage grouse n... Show more Bureau of Land Management 3/08/2010
UNIVERSITY OF NEVADA, RENO $307,109 Earthquake Hazards Reduction Program Upgrade selected seismic stations of the Western Great Basin Seismic Network. The hardware of the current network is out of date and in need of upgrades in the areas of DAS, sensors, telemetry and infrastructure. The proposal submitted develops a strate Geological Survey 9/15/2009
TRI STATE SURVEYING LTD INC $219,667 Tuscarora AML Cadastral Survey. The surveys to be executed under this Group are undertaken by requset from the field office, to identify the boundaries of the intermingled federal and private lands in T.40 N., R. 51E., Mount Diablo Meridian. Bureau of Land Management 6/30/2009
GREAT BASIN BIRD OBSERVATORY $166,208 Lower Colorado River Multi-Species Conservation Program. American Recovery and Reinvestment Act of 2009 Elf Owl Studies G?? A detect ability study will be conducted on a known population of elf owls that breeds in riparian habitats in order to determine the best protocol to survey for the elf owl.The... Show more Bureau of Reclamation 9/11/2009
PYRAMID LAKE PAIUTE TRIBE $164,300 Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State Academic achievement standards. Indian Affairs (Assistant Secretary) 11/09/2009
PYRAMID LAKE JR/SR HIGH SCHOOL $164,300 Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards. Provide technology accessibility for Native American high school students to increase their knowledge and skills to obtain a hig... Show more Indian Affairs (Assistant Secretary) 11/09/2009
PYRAMID LAKE PAIUTE TRIBE $164,300 Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State Academic achievement standards. Indian Affairs (Assistant Secretary) 11/09/2009
Northern Nevada Rebar, Inc $147,353 22000sf metal building for civil maintenance
This spending item is part of a $6,753,706 allocation. See details
Bureau of Reclamation 8/03/2010
Quality Painting & Maintenance $135,233 The work of this contract consists of the general construction of 3,750 LF of a 10 waterline in Bunker Rd, installation of 940 LF of a 6 waterline ate the horse stables, with service to the blimp hangar, valve vault modifications at the Ft. Barry Water t
This spending item is part of a $1,010,249 allocation. See details
National Park Service 5/12/2010
SUMMIT ENGINEERING CORPORATION $134,700 The goal of this project is to improve the processing of applications for renewable energy on public lands by providing complete, accurate, and easily accessible source documents, records, digital data and map products that would assist, restrict andior p
This spending item is part of a $665,031 allocation. See details
Bureau of Land Management 3/18/2010
IIF DATA SOLUTIONS, INC. $134,486 Provides technical reviews on all preliminary Information submitted by private parties for the site planning and construction of Renewable Power generation facilities. Review of independent engineering reviews performed by third parties for the contructi Bureau of Land Management 9/22/2009
PYRAMID LAKE PAIUTE TRIBE $130,143 Highway Planning and Construction To furnish all labor, materials, and services to provide construction and tribal project management activities for sign installation and pavement marking on 19.600 miles of Routes 3, 4, 6, 12, 13, 31, 33, 101, 102, 103, 201 and 310. Project ID H61A09. Indian Affairs (Assistant Secretary) 3/23/2010
PYRAMID LAKE PAIUTE TRIBE $120,000 Highway Planning and Construction To furnish all labor, materials, and services to provide project planning, preconstruction services, and tribal project management activities to develop plans, special contract requirements, and engineer's estimate (P,S&E) for approximately 0.300 miles of Indian Affairs (Assistant Secretary) 3/23/2010
SUMMIT ENGINEERING CORPORATION $82,500 This Bureau of Land Management (BLM), Colorado State Office, American Recovery and Reinvestment Act (ARRA) task will improve the quality for GCDB, LR2000 and MTP data. The result of this work will increase the spatial accuracy of GCDB, thereby giving BLM
This spending item is part of a $644,440 allocation. See details
Bureau of Land Management 3/15/2010
GREAT BASIN INSTITUTE $74,987 Recreation Resource Management This Recovery Act project will create 4 jobs during the spring and summer of 2010 and will employ local residents in Nevada. This project would implement the route designations identified in the Black Rock Desert ? High Rock Canyon Emigrant Trails Nationa Bureau of Land Management 2/22/2010
HIGH DESERT MICROIMAGING, INC. $70,000 a. The purpose of this contract is to create a digital file image and archival film image of the Bureau of Land Management (BLM), Nevada State Office CDI aperture cards. The BLM estimates there are 40,000 CDI aperture cards. The Contractor will provide Bureau of Land Management 3/09/2010
HIGH DESERT MICROIMAGING, INC. $70,000 a. The purpose of this contract is to create a digital file image and archival film image of the Bureau of Land Management (BLM), Nevada State Office CDI aperture cards. The BLM estimates there are 40,000 CDI aperture cards. The Contractor will provide Bureau of Land Management 3/09/2010
RENO-SPARKS INDIAN COLONY $62,072 Native American Employment and Training Supplemental Youth Service Funds through the American Recovery and Investment Act of 2009 Indian Affairs (Assistant Secretary) 6/01/2009
RENO-SPARKS INDIAN COLONY $57,447 Highway Planning and Construction ARRA IRR Project RSIC Rd Sealing No.1 H61A0400 Survey, preliminary engineering, design, right-of-way, archeology, environmental and construction for pavement preservation of Hungry Valley streets (IRR Inventory Routes 102 & 104). Indian Affairs (Assistant Secretary) 8/03/2010
RENO-SPARKS INDIAN COLONY $57,447 Highway Planning and Construction ARRA IRR PROJECT RSIC ROAD SEALING NO 1 H61A0400 This project will provide pavement preservation work to extend the useful life by 10-15 years of 2.25 miles of community streets in the low-income Native American community of Hungry Valley. The work will Indian Affairs (Assistant Secretary) 8/03/2010
SUMMIT LAKE PAIUTE TRIBE $54,484 Road Maintenance_Indian Roads Procure equipment (skidsteer) to maintain roads and perform an assessment of Indian Reservation Roads within the Summit Lake Paiute Reservation, pursuant to Project ID H616551H. Indian Affairs (Assistant Secretary) 3/23/2010
SUMMIT LAKE PAIUTE TRIBE $54,484 Road Maintenance_Indian Roads Procure equipment (skidsteer) to maintain roads and perform an assessment of Indian Reservation Roads within the Summit Lake Paiute Reservation. Indian Affairs (Assistant Secretary) 3/26/2010
RENO-SPARKS INDIAN COLONY $36,417 Road Maintenance_Indian Roads ARRA Project RSIC ROAD R&R H616531H Bobcat Purchase Indian Affairs (Assistant Secretary) 3/23/2010
O'CONNOR CONSTRUCTION MANAGEMENT INC $12,486 Architectural and Engineering Services for the Black Rock Administration Facility
This spending item is part of a $411,757 allocation. See details
Bureau of Land Management 9/22/2009
O'CONNOR CONSTRUCTION MANAGEMENT INC $6,870 Architectural and Engineering Services for Solar Power Facilities
This spending item is part of a $392,504 allocation. See details
Bureau of Land Management 12/02/2009
NATURE CONSERVANCY, THE $3,400 Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. Work collaboratively with area landowners to plan and implement priority habitat enhancement projects for Greater Sage-grouse on private lands located in the Bodie Hills, California.
This spending item is part of a $100,000 allocation. See details
U.S. Fish and Wildlife Service 9/15/2009
NA AMERICA MAPPING, INC $2,560 AE DESIGN SERVICES FOR SCHEMATIC DESIGN DEVELOPMENT AND CONSTRUCTION FOR FURNACE CREEK VISITORS CENTER AT DEATH VALLEY NATIONAL PARK.
This spending item is part of a $291,741 allocation. See details
National Park Service 8/06/2009