Clackamas County, Ore., funds by Interior, Department of
Listing $6,082,693.42 in stimulus funds from Interior, Department of for Clackamas
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
OTAK, INC. | $1,483,470 | Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. | Bureau of Land Management | 8/14/2009 |
OTAK, INC. | $856,561 | Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. | Bureau of Land Management | 5/27/2010 |
RICHARD PHILLIPS MARINE, INC. | $478,110 | Slide Gate Modifications , Pueblo Dam, Frying Pan -Arkansas Project, Colorado | Bureau of Reclamation | 6/09/2010 |
OTAK, INC. | $427,346 |
LEED Replacement Fire Cache Facilities Design
This spending item is part of a $575,171 allocation.
See details
|
Bureau of Land Management | 4/27/2010 |
OTAK, INC. | $339,328 | Rawlins - Rock Springs Visual Resource Inventory | Bureau of Land Management | 5/05/2010 |
CASCADE DESIGN PROFESSIONALS, INC | $287,873 | U.S. Fish and Wildlife Service - Quilcene National Fish Hatchery - Hatchery Seismic & Safety Upgrade | U.S. Fish and Wildlife Service | 6/15/2009 |
DAY MANAGEMENT CORP. | $177,002 | Design and install Telemtry system at Crater Lake. | Geological Survey | 8/17/2010 |
COMBINED EFFORT, INC. | $175,418 | Remove and replace steel walkways with aluminum walkways at Eagle Creek Hatchery. | U.S. Fish and Wildlife Service | 12/01/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $169,879 | EAGLE CREEK TIER 1 ENERGY UPGRADE | U.S. Fish and Wildlife Service | 11/25/2009 |
DAY MANAGEMENT CORP. | $149,490 | Telemtry Design and Telemtry installation at Crescent Tower site. | Geological Survey | 8/17/2010 |
OTAK, INC. | $148,055 | Oregon/Washington Bureau of Land Management (OR/WA BLM) is in need of structural evaluations and corrective action recommendations for certain load rated vehicle bridges located in Western Oregon. The objective of this project is for each bridge to be eva | Bureau of Land Management | 8/21/2009 |
OTAK, INC. | $144,813 | Project work includes the design of replacement facilites for the exisitng Green Mountain fire lookout. Replacement facilities wil include a new lookout tower, living quarters for lookout personnel, a small building for communications equipment and batte | Bureau of Land Management | 9/21/2009 |
OTAK, INC. | $137,509 | For the BLM Roseburg District Office, conduct a comprehensive evaluation fo the existing HVAC system, develop a plan for the sytem retrofit, design and prepare construction contract drawings, specifications and cost estimates, and inspect the installation | Bureau of Land Management | 8/25/2009 |
OTAK, INC. | $108,868 | Camouflage demonstration and evaluation, Wyoming | Bureau of Land Management | 6/25/2010 |
RICHARD PHILLIPS MARINE, INC. | $98,606 | Inspect and service buoys and mooring system at Buck Island Reef National Monument | National Park Service | 12/15/2009 |
DAY MANAGEMENT CORP. | $77,745 | Telemetry design and installation of Telemetry system at Lassen Peak. | Geological Survey | 8/17/2010 |
DAY MANAGEMENT CORP. | $75,845 | Telemetry system design and installation at Walker Mtn | Geological Survey | 8/17/2010 |
OTAK, INC. | $70,877 | Pollen lab replacement | Bureau of Land Management | 12/16/2009 |
OTAK, INC. | $69,973 | Recovery - Salem District Office window/skylight renovation | Bureau of Land Management | 9/22/2009 |
OTAK, INC. | $69,671 | Design and documentation for lead paint encapsulation. | Bureau of Land Management | 4/14/2010 |
DAY MANAGEMENT CORP. | $61,295 | Telemetry design and installation at Pine Mountain tower site. | Geological Survey | 8/16/2010 |
CASCADE DESIGN PROFESSIONALS, INC | $59,254 | Planning & Design Services for Rehab Predator Exclusion Cover at Lower Raceways at Carson NFH | U.S. Fish and Wildlife Service | 8/19/2009 |
OTAK, INC. | $55,730 | At the Salem District Office the existing heating/domestic hot water system is 30 years old, is inefficient, and maintenance repairs and part replacements have become more frequent in recent years. This work includes anylising existing building, and desig | Bureau of Land Management | 9/22/2009 |
OTAK, INC. | $54,036 | The A-E shall visit the National Historic Oregon Trail Interpretive Center (NHOTIC), meet with Bureau of Land Management (BLM) staff and review existing conditions necessary in achieving the goals of Executive Order (E.O.) 13423, section 2(f). The goal of | Bureau of Land Management | 9/22/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $48,950 | Abernathy Earthen Basin Repair - AE Planning & Design Services | U.S. Fish and Wildlife Service | 9/25/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $36,880 | Abernathy Earthen Basin Repair - AE Planning and Design Services | U.S. Fish and Wildlife Service | 9/25/2009 |
Harvey Buche Enterprises | $36,568 |
Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a
This spending item is part of a $2,577,383 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/18/2010 |
OTAK, INC. | $34,967 | Green Mountain Lookout replacement construction management services continued this quarter. | Bureau of Land Management | 4/22/2010 |
DAY MANAGEMENT CORP. | $27,000 | Engineering desing services for Glacier Peak Telemetry System | Geological Survey | 8/17/2010 |
CASCADE DESIGN PROFESSIONALS, INC | $25,000 |
Contract is to provide enginering services during construction for the renovation of the Flandreau Community School project. Deliverables consist of reviewed submittals, requests for information and design changes provided to the contracting officer.
This spending item is part of a $259,476 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 2/05/2010 |
OTAK, INC. | $22,118 | Assess existing Interpretive Center heating, ventilation and air conditioning (HVAC) system and determine feasibility of installing a ground source heat pump. Develop a written evaluation describing the feasibility of replacing the conventional split syst | Bureau of Land Management | 9/22/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $16,494 | U.S. Fish and Wildlife Service - Quilcene National Fish Hatchery - Headbox Construction Inspection | U.S. Fish and Wildlife Service | 6/15/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $16,308 | Providing Construction Assistance and Sediment Sampling for the Effluent Pond Rehabilitation at Abernathy Fish Technology Center | U.S. Fish and Wildlife Service | 2/26/2010 |
OTAK, INC. | $10,124 |
Recovery - heating/domestic hot water system retrofit, Salem District Oregon
This spending item is part of a $65,164 allocation.
See details
|
Bureau of Land Management | 9/22/2009 |
OTAK, INC. | $9,477 |
Yaquina Head Outstanding Natural Area security system design
This spending item is part of a $72,394 allocation.
See details
|
Bureau of Land Management | 5/28/2010 |
OTAK, INC. | $9,343 |
Mesa Verde National Park - Technical analysis and recommendations for the purchase of three alternative fuel transit trams, Mesa Verde National Park, Colorado.
This spending item is part of a $86,438 allocation.
See details
|
National Park Service | 8/20/2009 |
OTAK, INC. | $5,020 |
Acadia National Park - Repair damaged culverts and associated headwalls
This spending item is part of a $128,038 allocation.
See details
|
National Park Service | 6/16/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $5,000 | Scoping Visit to Quilcene Fish Hatchery | U.S. Fish and Wildlife Service | 6/15/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $2,495 | Abernathy Fish Technology Center | U.S. Fish and Wildlife Service | 10/07/2009 |
OTAK, INC. | $196 |
Acadia National Park - Perform preservation treatment on roads parkwide
This spending item is part of a $106,147 allocation.
See details
|
National Park Service | 7/08/2009 |
OTAK, INC. | $0 |
Acadia National Park - Title III services - rehabilitate roads, headwalls and culverts
This spending item is part of a $37,006 allocation.
See details
|
National Park Service | 2/26/2010 |
OTAK, INC. | $0 |
Shenandoah National Park - Road rehabilitation construction document services
This spending item is part of a $608,048 allocation.
See details
|
National Park Service | 6/18/2009 |