Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Clackamas County, Ore., funds by Interior, Department of

Listing $6,082,693.42 in stimulus funds from Interior, Department of for Clackamas

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
OTAK, INC. $1,483,470 Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. Bureau of Land Management 8/14/2009
OTAK, INC. $856,561 Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. Bureau of Land Management 5/27/2010
RICHARD PHILLIPS MARINE, INC. $478,110 Slide Gate Modifications , Pueblo Dam, Frying Pan -Arkansas Project, Colorado Bureau of Reclamation 6/09/2010
OTAK, INC. $427,346 LEED Replacement Fire Cache Facilities Design
This spending item is part of a $575,171 allocation. See details
Bureau of Land Management 4/27/2010
OTAK, INC. $339,328 Rawlins - Rock Springs Visual Resource Inventory Bureau of Land Management 5/05/2010
CASCADE DESIGN PROFESSIONALS, INC $287,873 U.S. Fish and Wildlife Service - Quilcene National Fish Hatchery - Hatchery Seismic & Safety Upgrade U.S. Fish and Wildlife Service 6/15/2009
DAY MANAGEMENT CORP. $177,002 Design and install Telemtry system at Crater Lake. Geological Survey 8/17/2010
COMBINED EFFORT, INC. $175,418 Remove and replace steel walkways with aluminum walkways at Eagle Creek Hatchery. U.S. Fish and Wildlife Service 12/01/2009
FIVE RIVERS CONSTRUCTION, INC. $169,879 EAGLE CREEK TIER 1 ENERGY UPGRADE U.S. Fish and Wildlife Service 11/25/2009
DAY MANAGEMENT CORP. $149,490 Telemtry Design and Telemtry installation at Crescent Tower site. Geological Survey 8/17/2010
OTAK, INC. $148,055 Oregon/Washington Bureau of Land Management (OR/WA BLM) is in need of structural evaluations and corrective action recommendations for certain load rated vehicle bridges located in Western Oregon. The objective of this project is for each bridge to be eva Bureau of Land Management 8/21/2009
OTAK, INC. $144,813 Project work includes the design of replacement facilites for the exisitng Green Mountain fire lookout. Replacement facilities wil include a new lookout tower, living quarters for lookout personnel, a small building for communications equipment and batte Bureau of Land Management 9/21/2009
OTAK, INC. $137,509 For the BLM Roseburg District Office, conduct a comprehensive evaluation fo the existing HVAC system, develop a plan for the sytem retrofit, design and prepare construction contract drawings, specifications and cost estimates, and inspect the installation Bureau of Land Management 8/25/2009
OTAK, INC. $108,868 Camouflage demonstration and evaluation, Wyoming Bureau of Land Management 6/25/2010
RICHARD PHILLIPS MARINE, INC. $98,606 Inspect and service buoys and mooring system at Buck Island Reef National Monument National Park Service 12/15/2009
DAY MANAGEMENT CORP. $77,745 Telemetry design and installation of Telemetry system at Lassen Peak. Geological Survey 8/17/2010
DAY MANAGEMENT CORP. $75,845 Telemetry system design and installation at Walker Mtn Geological Survey 8/17/2010
OTAK, INC. $70,877 Pollen lab replacement Bureau of Land Management 12/16/2009
OTAK, INC. $69,973 Recovery - Salem District Office window/skylight renovation Bureau of Land Management 9/22/2009
OTAK, INC. $69,671 Design and documentation for lead paint encapsulation. Bureau of Land Management 4/14/2010
DAY MANAGEMENT CORP. $61,295 Telemetry design and installation at Pine Mountain tower site. Geological Survey 8/16/2010
CASCADE DESIGN PROFESSIONALS, INC $59,254 Planning & Design Services for Rehab Predator Exclusion Cover at Lower Raceways at Carson NFH U.S. Fish and Wildlife Service 8/19/2009
OTAK, INC. $55,730 At the Salem District Office the existing heating/domestic hot water system is 30 years old, is inefficient, and maintenance repairs and part replacements have become more frequent in recent years. This work includes anylising existing building, and desig Bureau of Land Management 9/22/2009
OTAK, INC. $54,036 The A-E shall visit the National Historic Oregon Trail Interpretive Center (NHOTIC), meet with Bureau of Land Management (BLM) staff and review existing conditions necessary in achieving the goals of Executive Order (E.O.) 13423, section 2(f). The goal of Bureau of Land Management 9/22/2009
CASCADE DESIGN PROFESSIONALS, INC $48,950 Abernathy Earthen Basin Repair - AE Planning & Design Services U.S. Fish and Wildlife Service 9/25/2009
CASCADE DESIGN PROFESSIONALS, INC $36,880 Abernathy Earthen Basin Repair - AE Planning and Design Services U.S. Fish and Wildlife Service 9/25/2009
Harvey Buche Enterprises $36,568 Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a
This spending item is part of a $2,577,383 allocation. See details
Indian Affairs (Assistant Secretary) 3/18/2010
OTAK, INC. $34,967 Green Mountain Lookout replacement construction management services continued this quarter. Bureau of Land Management 4/22/2010
DAY MANAGEMENT CORP. $27,000 Engineering desing services for Glacier Peak Telemetry System Geological Survey 8/17/2010
CASCADE DESIGN PROFESSIONALS, INC $25,000 Contract is to provide enginering services during construction for the renovation of the Flandreau Community School project. Deliverables consist of reviewed submittals, requests for information and design changes provided to the contracting officer.
This spending item is part of a $259,476 allocation. See details
Indian Affairs (Assistant Secretary) 2/05/2010
OTAK, INC. $22,118 Assess existing Interpretive Center heating, ventilation and air conditioning (HVAC) system and determine feasibility of installing a ground source heat pump. Develop a written evaluation describing the feasibility of replacing the conventional split syst Bureau of Land Management 9/22/2009
CASCADE DESIGN PROFESSIONALS, INC $16,494 U.S. Fish and Wildlife Service - Quilcene National Fish Hatchery - Headbox Construction Inspection U.S. Fish and Wildlife Service 6/15/2009
CASCADE DESIGN PROFESSIONALS, INC $16,308 Providing Construction Assistance and Sediment Sampling for the Effluent Pond Rehabilitation at Abernathy Fish Technology Center U.S. Fish and Wildlife Service 2/26/2010
OTAK, INC. $10,124 Recovery - heating/domestic hot water system retrofit, Salem District Oregon
This spending item is part of a $65,164 allocation. See details
Bureau of Land Management 9/22/2009
OTAK, INC. $9,477 Yaquina Head Outstanding Natural Area security system design
This spending item is part of a $72,394 allocation. See details
Bureau of Land Management 5/28/2010
OTAK, INC. $9,343 Mesa Verde National Park - Technical analysis and recommendations for the purchase of three alternative fuel transit trams, Mesa Verde National Park, Colorado.
This spending item is part of a $86,438 allocation. See details
National Park Service 8/20/2009
OTAK, INC. $5,020 Acadia National Park - Repair damaged culverts and associated headwalls
This spending item is part of a $128,038 allocation. See details
National Park Service 6/16/2009
CASCADE DESIGN PROFESSIONALS, INC $5,000 Scoping Visit to Quilcene Fish Hatchery U.S. Fish and Wildlife Service 6/15/2009
CASCADE DESIGN PROFESSIONALS, INC $2,495 Abernathy Fish Technology Center U.S. Fish and Wildlife Service 10/07/2009
OTAK, INC. $196 Acadia National Park - Perform preservation treatment on roads parkwide
This spending item is part of a $106,147 allocation. See details
National Park Service 7/08/2009
OTAK, INC. $0 Acadia National Park - Title III services - rehabilitate roads, headwalls and culverts
This spending item is part of a $37,006 allocation. See details
National Park Service 2/26/2010
OTAK, INC. $0 Shenandoah National Park - Road rehabilitation construction document services
This spending item is part of a $608,048 allocation. See details
National Park Service 6/18/2009