Multnomah County, Ore., funds by Interior, Department of
Listing $11,295,918.36 in stimulus funds from Interior, Department of for Multnomah
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
KADRI INTERNATIONAL CO. | $966,907 | Recovery contract work for georeferencing plats and conversion to AutoCAD format of approx. 2088 plats. | Bureau of Land Management | 4/23/2010 |
RANSENBERG, ALAN | $966,792 | Our award was received from the U.S. Fish and Wildlife Service. We will be creating and developing interior and exterior interpretive exhibits from the concept level through final design, fabrication and installation for Kealia Pond National Wildlife Refu | U.S. Fish and Wildlife Service | 12/28/2009 |
WILLIAMS FORM ENGINEERING CORPORATION | $959,567 |
8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP.
This spending item is part of a $17,480,694 allocation.
See details
|
Bureau of Reclamation | 3/27/2010 |
GEOLOGY AND MINERAL INDUSTRIES, OREGON DEPARTMENT OF | $931,000 | Volcano Hazards Program Research and Monitoring. This award provides funds to Oregon Lidar Consortium administered by OR Department of Geology and Mineral Industries (DOGAMI) to collect very accurate elevation data for active volcanoes in the Cascade Range in California, Oregon, and Washington. The e dat... Show more | Geological Survey | 11/13/2009 |
FORMATIONS INC | $827,500 | Design / Fabricat and Install exhibits at San Luis Visitor Center | U.S. Fish and Wildlife Service | 7/16/2009 |
FORMATIONS INC | $827,500 | Design / Fabricate and Install exhibits at San Luis Visitor Center | U.S. Fish and Wildlife Service | 7/16/2009 |
CHEMETEK LLC | $753,548 |
The scope of this contract will be to provide the required 24) continuous stream Silt Density Index (SDI) Analyzers to support the Yuma Desalting Plant and Water Quality Improvement Center (WQIC) and (24) Spare Kits. The contractor shall furnish all contr
This spending item is part of a $1,040,929 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
CALYPTUS CONSULTING GROUP, INC. | $748,599 | Contract ended on 9/30/11 | U.S. Fish and Wildlife Service | 6/30/2009 |
KAPALA IT LLC | $740,900 |
Of the over 5,000 townships in both Oregon and Washington, contracted work on 2874 townships are eligible for ARRA funding. This contract award addresses post scanning support tasks required in ARRA townships to provide the indexed and accessible digital
This spending item is part of a $893,067 allocation.
See details
|
Bureau of Land Management | 12/16/2009 |
FORMATIONS INC. | $401,117 | Design/build sercies including comprehensive research and information necessary for exhibit development, planning, design, production and installation of new exhibits at Governors Island, Castle Williams. | National Park Service | 12/17/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $296,386 | Specific work tasks for energy upgrades at various designated facilities. | U.S. Fish and Wildlife Service | 6/11/2010 |
YOUR RECRUITING COMPANY, INC. | $283,455 | This requirement is to provide temporary acquisition and contract administration support in support of the Bureau of Land Management performing a wide variety of acquisition activities from procurement planning, solicitation, evaluation and award. | Bureau of Land Management | 2/12/2010 |
LANPACIFIC, INC. | $252,029 |
Services Provided: Screen chamber remediation, piping and design including wall reconstruction.
This spending item is part of a $431,700 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/16/2009 |
KAPALA IT LLC | $213,767 |
The purpose of this task addition is to increase the number of contract employees to facilitate the completion of the Control Document Index (CDI) support under the original (Non-ARRA) task order. Approximately 330,000 cards will be scanned and indexed
This spending item is part of a $282,819 allocation.
See details
|
Bureau of Land Management | 8/26/2010 |
FORMATIONS INC | $211,000 | Design Fabrication and Installation of New Exhibits at National Elk Refuge, Jackson Hole, and Greater Yellowstone Visitor Center, Wyoming | U.S. Fish and Wildlife Service | 8/21/2009 |
CTA INC. | $182,320 | Electric Power Generation (EPG)-Part of Project R8CA install photovoltaic (PV) systems. AE design for PV systems. | U.S. Fish and Wildlife Service | 9/01/2009 |
Oregon Dept of Geology | $180,000 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 Multi-Hazard Risk and Vunerability Assessments | Geological Survey | 11/13/2009 |
GEOLOGY AND MINERAL INDUSTRIES, OREGON DEPARTMENT OF | $180,000 | Volcano Hazards Program Research and Monitoring. The goal of this award is to deliver effective risk communication to improve public awareness and understanding of risk management and mitigation concepts associated with volcano and related hazards from Mt. Hood. The approach is qualitative, emphasizizing ... Show more | Geological Survey | 11/13/2009 |
INTERFACE ENGINEERING, INC. | $112,032 |
LEED Replacement Fire Cache Facilities Design
This spending item is part of a $575,171 allocation.
See details
|
Bureau of Land Management | 4/27/2010 |
POST BUCKLEY SCHUH & JERNIGAN INC | $94,747 | RECOVERY-NEPA FOR ARRA PROJECTS AT MALHEUR NATIONAL WILDLIFE REFUGE | U.S. Fish and Wildlife Service | 9/11/2009 |
KAPALA IT LLC | $79,146 |
Provide support to the Bureau of Land Management (BLM), Oregon State Office (ORSO), Branch of Geographic Sciences, in consultation with the Branch of Land and Mineral Resources, for the update and maintenance of BLMG??s official title, land and mineral re
This spending item is part of a $186,270 allocation.
See details
|
Bureau of Land Management | 12/16/2009 |
FINE PAINTING AND ALLIED SERVICES LLC | $75,750 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
STEVENS WATER MONITORING SYSTEMS INC | $69,427 | 198 SATELLITE ANTENNAS AND MOUNTS FOR GOES. | Interior, Department of | 9/30/2009 |
Brandsen Hardwood Floors Inc. | $67,925 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
INTERFACE ENGINEERING, INC. | $62,918 |
Yaquina Head Outstanding Natural Area security system design
This spending item is part of a $72,394 allocation.
See details
|
Bureau of Land Management | 5/28/2010 |
ENSOFTEK, INC. | $60,269 | Temporary Administrative Support services for ARRA Procurement team. | U.S. Fish and Wildlife Service | 6/23/2010 |
FORMATIONS INC | $56,439 | Design Fabrication and Installation Exhibits for the Jackson Hole, and Greater Yellowstone Visitor Center, Wyoming | U.S. Fish and Wildlife Service | 6/30/2010 |
INTERFACE ENGINEERING, INC. | $55,040 |
Recovery - heating/domestic hot water system retrofit, Salem District Oregon
This spending item is part of a $65,164 allocation.
See details
|
Bureau of Land Management | 9/22/2009 |
COOPER ZIETZ ENGINEERS, INC | $54,079 |
Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a
This spending item is part of a $2,577,383 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 3/18/2010 |
FORMATIONS INC | $51,067 | Design, Fabrication and Installation of Long Lake Entrance and Information Signs | U.S. Fish and Wildlife Service | 7/22/2009 |
Lynch Mechanical Construction LLC | $47,906 |
Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/24/2009 |
S BROOKS & ASSOCIATES INC | $45,542 | Staff Assistant Contracting | Bureau of Land Management | 12/14/2009 |
WATERSHED SCIENCES, INC. | $44,225 |
Sandy River LiDAR collection. Woolpert will be collecting and processing LiDAR and ground control over a 25.3 square mile area in Oregon. Work will begin in September due to river waterflow patterns.
This spending item is part of a $79,796 allocation.
See details
|
Geological Survey | 3/18/2010 |
KPFF, INC. | $35,793 |
LEED Replacement Fire Cache Facilities Design
This spending item is part of a $575,171 allocation.
See details
|
Bureau of Land Management | 4/27/2010 |
S BROOKS & ASSOCIATES INC | $35,542 | Secretarial Duties, preparing files, sorting mail, verifying information | Bureau of Land Management | 12/14/2009 |
CTA INC. | $33,690 | Electric Power Generation (EPG) - Part of project R8GR Replace inefficient HVACS and water heaters. AE design for boiler at Humbolt Bay NWR. | U.S. Fish and Wildlife Service | 9/01/2009 |
MCMILLEN, LLC | $31,913 | ARRA Inspection Services; construction inspection for construction projects associated with the ARRA. Projects are located at National Wildlife Refuges and National Fish Hatcheries in Regions 1 and 8. | U.S. Fish and Wildlife Service | 7/22/2010 |
KAPALA IT LLC | $29,947 |
The Bureau of Land Management a set of records called the Control Document Index cards. It consists of 35mm microfilmed copies of patents and other documents which convey title to and fiom the United States. There are also copies of documents such as publ
This spending item is part of a $764,991 allocation.
See details
|
Bureau of Land Management | 3/29/2010 |
RIDER LEVETT BUCKNALL LTD. | $29,808 | Contractor will assist the Engineering staff of the Fish and Wildlife Service in managing construction projects under the American Recovery and Reinvestment Act of 2009 (ARRA) | U.S. Fish and Wildlife Service | 10/16/2009 |
DIRT AND AGGREGATE INTERCHANGE, INC. | $25,320 |
Highway Planning and Construction The Project will provide for construction of Sid Walter Culvert Replacement in accordance with ODOT specification (FP Manual). The total construction length for this project is 0.40 KM on the Warm Springs Indian Reservation, Oregon.
This spending item is part of a $643,879 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/21/2010 |
S BROOKS & ASSOCIATES INC | $24,270 | Contract Specialist | Bureau of Land Management | 3/01/2010 |
BRATSLAVSKY CONSULTING ENGINEERS, INC. | $23,036 | On-call Project Management and Engineering services to provide support on miscellaneous ARRA projects in Regions 1 and 8. | U.S. Fish and Wildlife Service | 10/16/2009 |
BITTERROOT SERVICES & TECHNOLOGY LLC | $22,270 | prairie grass seeds | Bureau of Land Management | 6/01/2010 |
FORMATIONS INC | $20,050 | Review Existing Design Drawings for Accessibility requirements. Update cost estimate and graphics package. Revise Databases. | National Park Service | 9/05/2009 |
FORMATIONS INC | $16,929 | Final Design and Fabrication of 28 Duplicate Recovery Act Panels | U.S. Fish and Wildlife Service | 11/17/2009 |
FLETCHER FARR AYOTTE INC. | $14,219 | Architect-Engineer services provided to perform a variety of projects within National Park Service Units at locations primarily throughout the States of California, Nevada, Washington, Oregon, Idaho and Montana. Title I, Title II and Title III Services. | National Park Service | 4/06/2010 |
FORMATIONS INC | $13,164 | Design and Fabricate Replacement interpretive panels for Leadville National Fish Hatchery | U.S. Fish and Wildlife Service | 6/10/2010 |
FLETCHER FARR AYOTTE INC. | $12,569 | Title III Construction Management Services for Replacement of Flooring, Doors and selected furnishings at Sunrise Visitor Center, Mt. Rainier. | National Park Service | 6/17/2010 |
S BROOKS & ASSOCIATES INC | $11,269 | Contract Specialist | Bureau of Land Management | 2/16/2010 |
FORMATIONS INC | $9,716 | Final Design and Fabrication of Informational Signs | U.S. Fish and Wildlife Service | 11/19/2009 |
RANSENBERG, ALAN | $7,506 |
Upon final completion, the new interpretive trail facilities will replace or update similar facilities in the area that are outdated and inadequately designed. This recreation facility enhancement project will establish new intrepretive trail alignments
This spending item is part of a $37,369 allocation.
See details
|
Bureau of Land Management | 7/20/2010 |
U. S. Distributing, Inc. | $8 |
Design, Fabricate and deliver SR-18H Electrofishing Boat with 7.5GPP Plus Evinrude Outboard Engine Plus Matching Tandem Axle Trailer.
This spending item is part of a $98,217 allocation.
See details
|
Bureau of Reclamation | 3/31/2010 |