King County, Wash., funds by Interior, Department of
Listing $29,924,301.07 in stimulus funds from Interior, Department of for King
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SVR DESIGN COMPANY | $13,722,689 | Title I and Title II Design Services for Rehabilitation of Septic System at the Hoh Visitor Center | National Park Service | 8/04/2009 |
PACIFIC STUDIO, INC. | $1,900,100 |
We will provide all design-build services including comprehensive reasearch and all necessary information for exhibit development, planning, design, production and installation of interpretive media. We will begin by redesigning the existing exhibit plan
This spending item is part of a $3,431,314 allocation.
See details
|
National Park Service | 5/06/2010 |
RODARTE CONSTRUCTION, INC. | $1,797,553 |
Highway Planning and Construction Monies to go toward the road improvement of R St. and Grandview Stormwater Conveyance.
This spending item is part of a $1,810,616 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 5/26/2010 |
PURCELL P & C, LLC | $1,361,689 |
Carlsbad Caverns National Park, Eddy County, NM. Structural Steel repair and Lead Based Paint Abatement in Elevator Shaft Cave 116245
This spending item is part of a $4,133,011 allocation.
See details
|
National Park Service | 5/13/2010 |
LORACHE CAD/IT SERVICES LLC | $1,018,208 |
Seismic upgrade/retrofit of USGS (United States Geological Survey) warehouse and storage facility. DM0031.
This spending item is part of a $1,235,614 allocation.
See details
|
Geological Survey | 6/28/2010 |
VECA ELECTRIC COMPANY, INC. | $1,006,350 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
LONG PAINTING COMPANY | $722,680 |
Shasta Dam Spillway Bridge Repair. Work includes erecting (3) 125' sections of suspended scaffolding, setting up a containment system around the scaffolding, removing the existing heavy metal paint from the structural steel components of the superstructu
This spending item is part of a $1,289,000 allocation.
See details
|
Bureau of Reclamation | 4/30/2010 |
UNIVERSITY OF WASHINGTON | $599,388 | Earthquake Hazards Reduction Program The University of Washington enthusiastically proposes to upgrade the facilities and performance of the Pacific Northwest Seismic Network (PNSN) according to the guidelines of Announcement 09HQPA0021. Like most RSNs, PNSN has developed more-or-less hapha | Geological Survey | 9/29/2009 |
PYP ENTERPRISES | $568,145 |
The Broadband Technology Opportunities Program (BTOP) is a new competitive grant program that will enable consumers and businesses in unserved and underserved areas of the United States to access broadband services. Booz Allen Hamilton supports an end-to
This spending item is part of a $75,221,785 allocation.
See details
|
Office of Policy, Management and Budget/Chief Financial Officer | 8/03/2009 |
GLOBAL DIVING & SALVAGE, INC. | $432,051 | GLBA Anodes/Float Glacier Bay National Park and Preserve Alaska | National Park Service | 9/18/2009 |
PERFECT IMAGE INC | $410,000 | Control Document Index Scanning | Bureau of Land Management | 9/22/2009 |
SCARSELLA BROS. INC. | $407,858 |
Environmental Quality and Protection Resource Management The project has several different activities that are funded, they include the following: Acct 155) Paving Elwha Valey Road from station 41+00 to Station 70+00 and installation of the forcemain pipe from station 41+00 to station 86+00 (Completeted). Acct ... Show more
This spending item is part of a $1,044,997 allocation.
See details
|
National Park Service | 5/07/2010 |
MWH AMERICAS, INC. | $320,417 |
Environmental Quality and Protection Resource Management The project has several different activities that are funded, they include the following: Acct 155) Paving Elwha Valey Road from station 41+00 to Station 70+00 and installation of the forcemain pipe from station 41+00 to station 86+00 (Completeted). Acct ... Show more
This spending item is part of a $1,044,997 allocation.
See details
|
National Park Service | 5/07/2010 |
MWH AMERICAS, INC. | $320,417 |
The project has several different activities occurring that include the following: Acct 155: Paving Elwha Valley Road from station 41+00 to Station 70+00. and installation of the forcemain pipe from station 41+00 to 86+00. THIS WORK HAS BEEN COMPLETED.
This spending item is part of a $1,044,997 allocation.
See details
|
National Park Service | 5/07/2010 |
JONES & JONES ARCHITECTS AND LANDSCAPE ARCHITECTS, LTD | $283,938 | Title I Services for the Stehekin Dock, North Cascades National Park. | National Park Service | 8/19/2009 |
GRAY & OSBORNE PS | $282,962 |
Environmental Quality and Protection Resource Management The project has several different activities that are funded, they include the following: Acct 155) Paving Elwha Valey Road from station 41+00 to Station 70+00 and installation of the forcemain pipe from station 41+00 to station 86+00 (Completeted). Acct ... Show more
This spending item is part of a $1,044,997 allocation.
See details
|
National Park Service | 5/07/2010 |
GRAY & OSBORNE PS | $282,962 |
The project has several different activities occurring that include the following: Acct 155: Paving Elwha Valley Road from station 41+00 to Station 70+00. and installation of the forcemain pipe from station 41+00 to 86+00. THIS WORK HAS BEEN COMPLETED.
This spending item is part of a $1,044,997 allocation.
See details
|
National Park Service | 5/07/2010 |
COAST CRANE COMPANY | $275,730 | Purchase of a 30 Ton Hydraulic Rough Terrain Crane | Bureau of Reclamation | 12/03/2009 |
Rainier Steel, Inc. | $268,635 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
LAKESIDE INDUSTRIES, INC. | $242,204 |
To construct a new fish hatchery on the Lower Elwha Klallam Tribe Reservation. The new hatchery will help maintain existing Elwha River Fish stocks during removal of the Elwha and Glines Canyon dams and will produce coho, pink, and chum salmon and steelh
This spending item is part of a $16,502,618 allocation.
See details
|
National Park Service | 9/18/2009 |
MUCKLESHOOT INDIAN TRIBE | $236,400 | Title I Grants to Local Educational Agencies, Recovery Act The purpose of this award is to improve teaching and learning for students most at risk of failing to meet State academic achievement standards. | Indian Affairs (Assistant Secretary) | 1/20/2010 |
LONG PAINTING COMPANY | $230,779 |
Roza Diversion Dam Roller Gate Replacement
This spending item is part of a $1,054,477 allocation.
See details
|
Bureau of Reclamation | 9/29/2009 |
PACIFIC STUDIO, INC. | $227,309 | We will provide design-build exhibit service including comprehensive research and information necessary for the exhibit development, planning, design, fabrication and installation of new exhibits for the Meriwether Lewis Site, Natchez Trace Park, Lewis Co | National Park Service | 3/31/2010 |
JONES & STOKES ASSOCIATES INC | $223,979 |
Contractor will prepare and perform an Alternative Evaluation Report engineering study for a portion of the Preston Reach on the Entiat River in Washington. The purpose of the study is to develop and evaluate potential habitat improvement projects for ana
This spending item is part of a $285,714 allocation.
See details
|
Bureau of Reclamation | 8/27/2009 |
PERFECT IMAGE INC | $223,500 | Control Document Index Scanning | Bureau of Land Management | 9/22/2009 |
UNIVERSITY OF WASHINGTON | $220,000 | Volcano Hazards Program Research and Monitoring. The University of Washington enthusiastically proposes to upgrade the facilities and performance of the Pacific Northwest Seismic Network (PNSN) according to the guidelines of Announcement 09HQPA0021. Like most RSNs, PNSN has developed more-or-less hahapha... Show more | Geological Survey | 12/01/2009 |
University of Washington | $220,000 | U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 ARRA Upgrades to Seismic Monitoring of Cascade Volcanoes | Geological Survey | 11/30/2009 |
JONES & STOKES ASSOCIATES INC | $177,756 | Award will build upon work under the previously completed Preston Alternatives Evaluation Report for the Preston Habitat Improvement Project. Under this current award the draft and final plans and specifications for the Yurt Site preferred alternative wil | Bureau of Reclamation | 4/19/2010 |
JACOBS ENGINEERING GROUP INC. | $171,426 |
We provide Professional Engineering services for assisting the US Fish and Wildlife Service (USFWS) in completion of a Design Build (DB) Contract, for the relocation of the 25kV transmission line across the tidal marshlands within the Bandon Marsh Nationa
This spending item is part of a $198,313 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/09/2009 |
PORT ANGELES, CITY OF | $150,786 | Environmental Quality and Protection Resource Management Prepare a General Sewer Plan and Facility Plan Amendment for submission to the Washington State Department of Ecology for approval and prepare associated NEPA documentation for the National Park Service review and action. | National Park Service | 11/09/2009 |
SVR DESIGN COMPANY | $138,227 | Predesign Services, Evaluation of Septic System | National Park Service | 8/04/2009 |
SVR DESIGN COMPANY | $138,227 | The Contractor shall perform the work in accordance with the attached scope of work. The Contractor's revised fee proposal dated 7/21/09 is hereby incorporated by reference and made a part of the order. | National Park Service | 8/04/2009 |
COASTAL ENVIRONMENTAL SYSTEMS, INC | $122,889 | Environmental monitoring equipment deployment for areas in proximity to volcanos in Alaska and Hawaii. | Geological Survey | 2/18/2010 |
UNIVERSITY OF WASHINGTON | $115,000 | Fish, Wildlife and Plant Conservation Resource Management The objective of this project is to contribute field and lab information on restoration techniques and research that leads to more successful restoration projects and an increased availability of restoration materials crucial to the restoratioion of shrub-s... Show more | Bureau of Land Management | 1/27/2010 |
TROY COMPANY, INC. | $81,969 | fuel | Indian Affairs (Assistant Secretary) | 6/01/2010 |
JONES & JONES ARCHITECTS AND LANDSCAPE ARCHITECTS, LTD | $79,442 | Complete vacation cabin management plan and environmental analysis | National Park Service | 9/02/2009 |
LEAVENGOOD, DAVID ARCHITECT | $70,275 | Design Development and Construction Documents - Rehabilitation and Expansion of Visitor Center | National Park Service | 8/05/2009 |
MUCKLESHOOT INDIAN TRIBE | $61,500 | School Improvement Grants, Recovery Act The purpose of this award is to provide on-going, high quality professional development that is based on student data and aligned with the school's instructional program. This will be accomplished by using the $61,500 to expand our instructional Coachin | Indian Affairs (Assistant Secretary) | 9/28/2010 |
LEAVENGOOD, DAVID ARCHITECT | $51,948 | Title III-Construction Management Services - Rehabilitation and Expansion of visitor Center at Big Hole National Battlefield | National Park Service | 5/14/2010 |
DURABLE PLASTIC DESIGNS, LLC | $45,994 | Composite 2x6 structural lumber. | National Park Service | 9/16/2010 |
DURABLE PLASTIC DESIGNS, LLC | $45,994 | composite 2x6 structural lumber | National Park Service | 9/16/2010 |
UNIVERSITY OF WASHINGTON | $44,115 | Volcano Hazards Program Research and Monitoring. We will use WWLLN lightning location data to develop the software for an explosive volcano monitor. We will augment the WWLLN coverage in Alaska by installing a new WWLLN station in Alaska. Other than travel to install a new station, there is no tempmpora... Show more | Geological Survey | 2/02/2010 |
UNIVERSITY OF WASHINGTON | $44,115 | We will use WWLLN lightning location data to develop the software for an explosive volcano monitor. We will augment the WWLLN coverage in Alaska by installing a new WWLLN station in Alaska. Other than travel to install a new station, there is no tempora | Geological Survey | 3/04/2010 |
H. D. FOWLER CO., INC. | $39,426 |
Relocation of Existing 25kv Transmission Line crossing Coquille River and floodplain - Restoration of 400 acres of tidal marshlands along the Coquille River, near Bandon, Oregon. An existing 25kV line will be relocated from an overhead line to below groun
This spending item is part of a $2,435,101 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/30/2009 |
DURABLE PLASTIC DESIGNS, LLC | $39,296 | 2x6 Composite recycled plastic lumber | National Park Service | 4/07/2010 |
HD SUPPLY UTILITIES, LTD. | $38,876 | SUPPLY 2500 KVA 3 PHASE PADMOUNT TRANSFORMER FOR MT RAINIER NATIONAL PARK | National Park Service | 5/07/2010 |
JACOBS ENGINEERING GROUP INC. | $38,009 | Provide Value Engineering Analysis of project proposing to relocate a transmission line under Tidal Marsh Habitat Restoration Area, within the Bandon Marsh National Wildlife Refuge The U.S. Fish and Wildlife Service plans to relocate an existing 25kV tran | Interior, Department of | 7/20/2009 |
EDQUIST,DAVIS,EXHIBITS,INC. | $37,911 |
This project is for construction administration services for the installation of interpretive exhibits in both the Quarry Visitor Center and the lower level of the Quarry Exhibit Hall; outdoor exhibits at the visitor center; three interpretive exhibits in
This spending item is part of a $58,934 allocation.
See details
|
National Park Service | 9/13/2010 |
BROOKS RAND LABS, LLC | $37,079 | Award was for trace metals analyses of biological tissue samples. | Geological Survey | 9/21/2010 |
LEAVENGOOD, DAVID ARCHITECT | $35,253 | Scoping Trip and Preliminary Design Services for Rehabilitation and Expansion of Visitor at Big Hole National Battlefield | National Park Service | 5/05/2009 |
NOR-PAC SEATING COMPANY, INC. | $32,988 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
PARAMETRIX, INC. | $31,472 |
Environmental Quality and Protection Resource Management The project has several different activities that are funded, they include the following: Acct 155) Paving Elwha Valey Road from station 41+00 to Station 70+00 and installation of the forcemain pipe from station 41+00 to station 86+00 (Completeted). Acct ... Show more
This spending item is part of a $1,044,997 allocation.
See details
|
National Park Service | 5/07/2010 |
BLUE MARBLE ENERGY CORPORATION | $30,000 |
Forests and Woodlands Resource Management Montana Fuels for Schools has provided grants to assist with installation of woody biomass boiler systems in western Montana since 2003. This ARRA grant will provide a new influx of funding for the program at a critical time. By providing funding for fuel
This spending item is part of a $250,000 allocation.
See details
|
Bureau of Land Management | 1/22/2010 |
ENTRIX, INC. | $29,000 | TAS::14 1030:: RECOVERY MORA PMIS #152639 & 158069A/E Services, Engineering and Construction Design Services Carbon River Entrance and Emergency Flood Protection Longmire at Milepost 6, Mount Rainier National Park | National Park Service | 4/13/2010 |
JACOBS ENGINEERING GROUP INC. | $26,026 | Provide Preliminary Planning and Professional Engineering services for assisting the US Fish and Wildlife Service (USFWS) in awarding a Design Build Contract, for the relocation of the 25kV transmission line across the tidal marshlands within the Bandon M | U.S. Fish and Wildlife Service | 9/30/2009 |
APPLY-A-LINE INC | $25,616 |
Chip Seal Parking Lots and Roads @ National Historic Oregon Trail Information Center.
This spending item is part of a $193,591 allocation.
See details
|
Bureau of Land Management | 5/28/2010 |
JONES & JONES ARCHITECTS AND LANDSCAPE ARCHITECTS, LTD | $24,363 | John Day Fossil Beds National Monument, Oregon -PMIS #146613 | National Park Service | 8/28/2009 |
DAHN DESIGN, LLC | $19,196 | design and illustration and fabrication for interpretive panels at Red Rock Lake NWR | U.S. Fish and Wildlife Service | 8/25/2009 |
SVR DESIGN COMPANY | $17,123 | Title 1 preliminary design services for the installation of a photovoltaic system at park headquarters. | National Park Service | 8/26/2009 |
SVR DESIGN COMPANY | $17,123 | Title I Design Services for Installation of Photovoltic System at Park Headquarters, Craters of the Moon National Monument, Idaho | National Park Service | 8/26/2009 |
LEAVENGOOD, DAVID ARCHITECT | $12,000 | Title I Design Services for the Sheep Barn at Ebeys Landing | National Park Service | 9/24/2009 |
LEAVENGOOD, DAVID ARCHITECT | $10,000 | Historic Structure Reports for 19 US Army Barracks at Fort Vancouver National Historic site | National Park Service | 9/25/2009 |
NORTH WEST HANDLING SYSTEMS, INC. | $7,754 |
The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 9/25/2009 |
MATHEUS LUMBER COMPANY, INC. | $6,851 | Boardwalk Materials | National Park Service | 4/27/2010 |
SVR DESIGN COMPANY | $6,489 | The contractor shall perform the work in accordance with that attached scope of work. The Contractor's fee proposal dated 8/25/2009 is hereby incorporated by reference and made a part of the order. Funding for this project is provided pursuant to the Am | National Park Service | 8/26/2009 |
NUERA CORPORATION | $6,098 | RECOVERY DENA Heater | National Park Service | 3/29/2010 |
JONES & JONES ARCHITECTS AND LANDSCAPE ARCHITECTS, LTD | $5,096 | Title I Services, scoping trip for the replacement of the maintenance storage building at San Juan National Historic park | National Park Service | 8/25/2009 |
CALVIN JORDAN ASSOCIATES INC | $3,650 | Attend a Pre-Bid Site Visit for the Construction Contract of the Equipment Storage Building, Hakalau Forest | U.S. Fish and Wildlife Service | 9/13/2009 |
MWH AMERICAS, INC. | $2,000 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |