Herat Teacher's Training Institute

Planned Start Month

July 2012

Estimated Cost

$988,865

Status

Completed

Province

Herat

Regional Command

RC-West

Project Description

No project description provided.

Project Goals

In order to lay ground work for lasting peace and stability in Afghanistan, the Herat Teacher Training Institute (HTTI) Expansion Project needs to be completed for the greater present day and future well-being of Herat Province. 

 

At present HTTI is operating in three different locations to include the HTTI facility, a local girl's school, and a local high school. The HTTI Expansion project directly responds to the lack of qualified teachers by providing an upper level education opportunity allowing for non-qualified teachers to become qualified (in-service training). At the same time the institute will provide two years specialized education for graduates of grade 12 also allowing for these students to become qualified (pre-service training). In support of both in-service and pre-service training, this project proposes two 20-classroom buildings to conduct teacher training as well as a separate latrine building that will contain separate male and female facilities. 

The HTTI Expansion project directly responds to the provision of quality education and opportunity for gender equity for Afghan females. Accepting that the dismally low number of qualified female teachers in Afghanistan directly correlates with families disallowing their daughters, especially older daughters, to attend school, it stands to reason that increasing the number of qualified female teachers in Afghanistan would likewise have a similarly positive impact and increase on the number of female students allowed to study.

Results

Results unknown.

Updates

Project was presented at the USFOR-A DET-W CERP Review Board on 01 March 2012. 

Project is in coordination with USAID, however, will be fully CERP funded. 

IGCE Cost methodology prepared and signed by Dr. Azam Azimi (USAIDS), IGCE included

Signed Letter of Justification (LOJ) - 29 Feb 2012...

Updated ADR to reflect changes... 

IGCE Cost methodology ...

Added updated Legal Review (signed) and Letter of Justification (signed)-30 May 2012

Added Appointment Package to CIDNE (Media) for PPO and Project Manager signed... 01 June 2012 ICO Jerry Cole

Added new CERP Checklist to reflect changes, new PM,additional info. (01 June 2012) Jerry Cole

Signed ADR added to CIDNE (SFC Ocampo)

Added BoQ to support IGCE for HTTI: 2 building, 2 story, & 20 classrooms in each building (Jerry Cole)

UPDATE-Added All CAT 8143 Storyboards thru 7JUL13, Invoices 1-3, EFTs 1-3, and DD250s 1-3. 20130707 - SFC Mark Woods

UPDATE - Added TOA Memorandum between SFC Mark Woods and Ian Mitchell - 20130806

UPDATE - The construction on this project is complete. The buildings were turned over to the School on 20130831. The only remaining activites are to pay the final invoice and to fiscally close out the project. - Update by Ian Mitchell 20130901