COMMUNICATIONS, OUTREACH, MULTIMEDIA, AND INFORMATION TECHNOLOGY (COMIT) CONTRACT. |
Other IT and Telecommunications |
MORI ASSOCIATES, INCORPORATED |
August 26, 2020 |
$0 |
TASK ORDER FOR COVID 19 IMPACT WORK |
Other Management Services |
CSRA LLC |
August 26, 2020 |
$0 |
COVID 19 3610
EAST 2 CONTRACT NNX16MB01C
THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE INCREMENTAL COVID FUNDING FOR QCN011.OP2.CLIN09.FIN MGT OF COVID FUNDS V02 COVID, QCN018.OP2.CLIN09.PROCESST RANSFORMATION V03 COVID, QCN010.OP2.CLIN09.WEBTADS SURGE RESPONSE V03 COVID, QCN027.OP2.CLIN09.SALESFORCE SOLUTION ARCHITECT V01 COVID AAO RFP OP2 004 PWS SALESFORCE SOLUTION ARCHITECT, COVID FUNDING FOR MAM ACCELERATION, QCN022.OP2.CLIN5.LEOS.V03.COVID LEGAL ENTERPRISE OPERATING SYSTEM(LEOS) |
IT and Telecom Facility Operation and Maintenance |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION |
August 25, 2020 |
$279,585 |
REPAIR KARS PARK I. ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FROM AUGUST 25, 2020, TO DECEMBER 15, 2020, DUE TO THE COVID-19 PANDEMIC. |
Recreation Facilities (Non Building) Maintenance |
INTERGRATED CONSTRUCTION MANAGEMENT, INC. |
August 25, 2020 |
$0 |
TO PROVIDE LIFTING DEVICES, LIFT PLANNING, LIFT DIRECTORS, LIFTING DEVICE OPERATORS, RIGGERS, SIGNAL PERSONS, AND SLINGS AND RIGGING HARDWARE AT STENNIS SPACE CENTER IN SUPPORT OF SPACE LAUNCH SYSTEM (SLS) LIFTING ACTIVITIES. |
Construction, Mining, Excavating, and Highway Maintenance Equipment Rental |
SARENS USA, INC. |
August 21, 2020 |
$314,870 |
HIGH PRESSURE AIR DRYER AND COMPRESSOR REPLACEMENT |
Pumps And Compressors Equipment Installation |
BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC |
August 20, 2020 |
$0 |
HVA EGS MULTIPLE FACILITIES NASA KSC, FL |
Other Architecture and Engineering Services |
JOHNSON, LEVINSON, RAGAN, DAVILA, INC. |
August 20, 2020 |
$0 |
SANITARY SEWER SYSTEM RECAPITALIZATION |
Miscellaneous Buildings Construction |
DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. |
August 20, 2020 |
$0 |
HIGH PRESSURE GAS PIPING SYSTEMS REPLACEMENT PHASE II |
Gas EPG Facilities Construction |
HEALTHEON, INC. |
August 20, 2020 |
$0 |
HIGH PURITY AIR DRYER DESIGN HIGH PRESSURE GAS FACILITY |
Miscellaneous Buildings Construction |
BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC |
August 20, 2020 |
$0 |
TASK ORDER FOR COVID 19 IMPACT WORK |
Other Management Services |
CSRA LLC |
August 19, 2020 |
$0 |
COMMUNICATIONS, OUTREACH, MULTIMEDIA, AND INFORMATION TECHNOLOGY (COMIT) CONTRACT. |
Other IT and Telecommunications |
MORI ASSOCIATES, INCORPORATED |
August 19, 2020 |
$0 |
METADATA INVENTORY SUPPORT SERVICES
THE CONTRACTOR SHALL PROVIDE METADATA INVENTORY SUPPORT SERVICES FOR MATERIAL THAT IS CLASSIFIED UP TO SECRET AND RESIDES ON NASA LANGLEY RESEARCH CENTER (LARC) IN B1247 FOR A PERIOD OF PERFORMANCE OF AUGUST 16 |
Other Professional Services |
ALUTIIQ FUSION JOINT VENTURE |
August 17, 2020 |
$0 |
INFICON MASS SPECTROMETER SUPPORT SERVICES AND INSTRUMENTS. MODIFICATION SUSPENDS CONTRACT LINE ITEM NUMBER 0002 INDEFINITELY DUE TO THE CURRENT COVID-19 TRAVEL LIMITATIONS AND ABILITY TO CONDUCT MISSION ESSENTIAL TRAINING REQUIREMENTS ON KSC. |
Laboratory Equipment and Supplies |
INFICON, INC. |
August 17, 2020 |
$0 |
NEST MS ELA AND OFFICE 365 UPGRADE |
IT and Telecom Facility Operation and Maintenance |
LEIDOS, INC. |
August 17, 2020 |
$12,630 |
PRODUCTION OF VIDEO SEGMENTS THAT SHOWCASE NASAS URBAN AIR MOBILITY VISION AND HIGHLIGHT CURRENT TECHNOLOGIES. CREATE A BRANDED USER-FRIENDLY BROADCASTING PROGRAM THAT CAN BE BUILT IN A MANNER THAT IT IS EXTENSIBLE TO FUTURE PROGRAMS. |
Other Professional Services |
ALUTIIQ FUSION JOINT VENTURE |
August 17, 2020 |
$0 |
ORION CREW EXPLORATION VEHICLE CONTRACT. |
Space Flight Advanced Development R&D |
LOCKHEED MARTIN CORPORATION |
August 17, 2020 |
$0 |
COVID-19 INCORPORATE ADVANCE AGREEMENT MOD
PLACE OF PERFORMANCE: GSFC
PROVIDE ENGINEERING SERVICES AND RELATED SERVICES TO MECHANICAL SYSTEMS DIVISION AND RELATED ORGANIZATIONS THROUGHOUT GSFC, AS REQUIRED, FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. THE ENGINEERING AREAS OF EMPHASIS ARE MULTIDISCIPLINARY WITH CONCENTRATION IN THE MECHANICAL ENGINEERING AREAS OF MATERIALS, STRUCTURAL ANALYSIS AND LOADS, MECHANICAL DESIGN, ELECTROMECHANICAL DESIGN, THERMAL, CONTAMINATION AND COATINGS, MANUFACTURING, AND INTEGRATION AND TEST.
TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE MULTIDISCIPLINARY ENGINEERING SERVICES, PURSUANT TO TASK ASSIGNMENTS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. |
Space Vehicle Components |
ATA AEROSPACE, LLC |
August 14, 2020 |
$0 |
TASK ORDER FOR COVID 19 IMPACT WORK |
Other Management Services |
CSRA LLC |
August 14, 2020 |
$400,000 |
REPLACE ROOF NASA SECURITY HEADQUARTERS FACILITY. MODIFICATION INCORPORATES FAR CLAUSES 52.204-24, 52.204-25 AND REQUEST FOR EQUITABLE ADJUSTMENT 1, COVID-19 122 DAYS SCHEDULE IMPACT. CONTRACT COMPLETION DATE IS CHANGED TO JANUARY 11, 2021. |
Office Buildings Maintenance |
CREMER GLOBAL SERVICES, INCORPORATED |
August 14, 2020 |
$0 |
TETRAFLUOROETHANE (R-134A) REFRIGERANT HEAVY GAS |
Gases: Compressed and Liquefied |
ASPEN REFRIGERANTS, INC. |
August 13, 2020 |
$359,840 |
JOHN F. KENNEDY SPACE CENTER CUSTODIAL SERVICES CONTRACT. MODIFICATION ADDS $110,997.33 IN COVID INVOICE FUNDING. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. REFERENCE FUNDING LOG (ATTACHED) IS HEREBY INCORPORATED INTO THE CONTRACT. |
Custodial Janitorial Services |
BREVARD ACHIEVEMENT CENTER, INC. |
August 13, 2020 |
$110,997 |
PROVIDE OPERATIONS AND MAINTENANCE AND RELATED SERVICES FOR THE FACILITIES OPERATIONS DIVISION. PROVIDE UTILITY AVAILABILITY FOR CRITICAL OPERATIONS SUCH AS POWER, UNINTERRUPTIBLE POWER SUPPLY, GENERATORS, ELEVATORS, FIRE PROTECTION SYSTEMS, UTILITY CONTROL SYSTEM, AND HEATING, VENTILATION, AIR-CONDITIONING AND REFRIGERATION (HVAC/R)SYSTEMS MISSION SUPPORT OPERATION AND MAINTENANCE OF HIGH VOLTAGE SHOP AND CENTRAL POWER PLANS SNOW/ICE REMOVAL ROOF REPLACEMENT/REPAIR ASBESTOS ABATEMENT PAINTING/CAULKING PAVING/CONCRETE FENCE REPAIRS CHEMICAL WATER TREATMENT BOILER MAINTENANCE/REPAIR AND EMERGENCY SERVICES. |
Facilities Operations Support Services |
AKIMA SUPPORT OPERATIONS, LLC |
August 12, 2020 |
$3,157,409 |
POTABLE WATER SYSTEM DESIGN, PHASE III AT STENNIS SPACE CENTER, MS |
Landscaping and Designing |
NELSON ENGINEERING CO. |
August 12, 2020 |
$0 |
ENGINEERING SUPPORT DURING CONSTRUCTION WEST PART SITE INFRASTRUCTURE UPGRADES. MODIFICATION EXTENDS COMPLETION DATE TO DECEMBER 30, 2020 DUE TO COVID-19, IN ACCORDANCE WITH TECHNICAL DIRECTIVE (TD)-01. EXTENSION IS AT NO COST TO THE GOVERNMENT. |
Other Architecture and Engineering Services |
JOHNSON, LEVINSON, RAGAN, DAVILA, INC. |
August 12, 2020 |
$0 |
COVID-19 (OMB MEMO M-20-22) CLARREO PATHFINDER REFLECTED SOLAR PAYLOAD (CPRSP) FULL SCALE MODEL |
Aeronautics/Space Technology Applied Research R&D |
REGENTS OF THE UNIVERSITY OF COLORADO, THE |
August 10, 2020 |
$0 |
COVID 19360
IN THE WAKE OF THE COVID-19 PANDEMIC, NASA IS SEEKING TO ENSURE THE SAFE AND SECURE RETURN TO WORK FOR ITS ~60,000 EMPLOYEES AND CONTRACTORS AT HEADQUARTERS, FIELD CENTERS AND FACILITIES WORLD-WIDE. |
Integrated Hardware/Software/Services Solutions |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION |
August 10, 2020 |
$484,472 |
CENTER OPERATIONS BUILDING AUTOMATION (COBA) |
Data Centers and Storage |
LINTECH GLOBAL, INC. |
August 07, 2020 |
$0 |
REMIS GALLERY FRIDGE |
Space Station R&D (Commercialized) |
REGENTS OF THE UNIVERSITY OF COLORADO, THE |
August 07, 2020 |
$0 |
CENTER OPERATIONS BUILDING AUTOMATION (COBA) |
Data Centers and Storage |
LINTECH GLOBAL, INC. |
August 07, 2020 |
$157,507 |
NASA END-USER SERVICES&TECHNOLOGIES (NEST) |
IT and Telecom Facility Operation and Maintenance |
LEIDOS, INC. |
August 06, 2020 |
$118,156 |
COVID-19 INCORPORATE ADVANCE AGREEMENT MOD
TECHNOLOGY AND INTEGRATED DISCIPLINE ENGINEERING SERVICES (TIDES). THIS CONTRACT IS FOR ENGINEERING AND RELATED SERVICES TO THE MISSION AND ENGINEERING AND SYSTEMS ANALYSIS DIVISION (MSAD) AND RELATED ORGANIZATIONS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF GUIDANCE, NAVIGATION AND CONTROL (GN&C) SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
Engineering/Technical Services |
TRIDENT VANTAGE SYSTEMS, LLC. |
August 04, 2020 |
$0 |
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS MAY BE EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS P |
Miscellaneous Buildings Construction |
BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC |
August 03, 2020 |
$0 |
LOGISTICS ROOF (K6-1547) ROOF REPLACEMENT, PCN: 99096. THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED FROM 7/31/2020 TO 8/31/2020 TO COMPLETE CONTRACT CLOSE OUT DUE
TO NO ACCESS TO KENNEDY SPACE CENTER AS A RESULT OF COVID 19. |
Miscellaneous Buildings Construction |
ODYSSEY INTERNATIONAL, INC. |
August 03, 2020 |
$0 |
GRC PROTECTIVE SERVICES CONTRACT LINE ITEM NUMBER 2, BASE SERVICES. |
Other Professional Services |
GOLDEN SVCS, L.L.C. |
July 31, 2020 |
$0 |
NASA HUMAN LANDING SYSTEM (HLS) DESCENT STUDY, DESCENT PROTOTYPES, REFUELING STUDY, AND REFUELING PROTOTYPES |
Other Applied Research/Exploratory Development R&D |
ORBITAL SCIENCES CORPORATION |
July 31, 2020 |
$0 |
ORION CREW EXPLORATION VEHICLE CONTRACT. |
Space Flight Advanced Development R&D |
LOCKHEED MARTIN CORPORATION |
July 31, 2020 |
$0 |
COVID 19 3610
COVID FUNDS TO SUPPORT PROCESS TRANSFORMATION FOR TELEWORK/COLLABORATION, INFRASTRUCTURE UPGRADES # CARES ACT FUNDING, COVID FUNDING FOR LEOS,ENTERPRISE O365 SOLUTIONS TEAM
NNX16MB01C EAST 2 MOD 112 |
IT and Telecom Facility Operation and Maintenance |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION |
July 31, 2020 |
$898,500 |
WEST PARK SITE INFRASTRUCTURE UPGRADES. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE COMPLETION DATE 15 DAYS TO AUGUST 15, 2020 TO EVALUATE DENIED ACCESS TO KSC IMPACTS CURRENTLY IN REVIEW. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
Miscellaneous Buildings Construction |
HEALTHEON, INC. |
July 30, 2020 |
$0 |
COMMUNICATIONS, OUTREACH, MULTIMEDIA, AND INFORMATION TECHNOLOGY (COMIT) CONTRACT. |
Other IT and Telecommunications |
MORI ASSOCIATES, INCORPORATED |
July 30, 2020 |
$0 |
COVID-19 3610 FUNDING FOR NASA INTEGRATED COMMUNICATIONS SERVICES
(NICS) NNM11AA04C |
IT and Telecom Facility Operation and Maintenance |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION |
July 29, 2020 |
$16,693 |
VACUUM SPIN STAND - DESIGN, ANALYSIS AND FABRICATION OF A NEW VACUUM SPIN STAND SUITABLE FOR TESTING ROTOR BLADES INSIDE THE NASA LANGLEY RESEARCH CENTER'S LANGLEY AEROTHERMODYNAMICS LABORATORY (LAL) 60-FT VACUUM SPHERE TEST CHAMBER (60VSTC). |
Aeronautics/Space Technology Basic Research R&D |
ADVANCED TECHNOLOGIES, INC. |
July 28, 2020 |
$0 |
DESIGN, ANALYZE FOR SAFETY, AND FABRICATE A HINGELESS BLADE SET TO BE USED WITH THE TILTROTOR AEROELASTIC STABILITY TESTBED (TRAST). |
Aeronautics/Space Technology Basic Research R&D |
EAGLE AVIATION TECHNOLOGIES, LLC |
July 28, 2020 |
$0 |
COMMON RESEARCH MODEL - DESIGN AND FABRICATION OF THE 10% ACOUSTICALLY TREATED-HIGH LIFT COMMON RESEARCH MODEL. THE NEW 10% AT-HL COMMON RESEARCH MODEL WILL BE TESTED AT NASA LANGLEY'S 14X22 FT. WIND TUNNEL. |
Aeronautics/Space Technology Basic Research R&D |
EAGLE AVIATION TECHNOLOGIES, LLC |
July 28, 2020 |
$0 |
KENNEDY INFRASTRUCTURE APPLICATIONS COMMUNICATIONS (KIAC)CONTRACT, CONTRACT LINE ITEM NUMBER (CLIN) 0010AA. MODIFICATION INCORPORATES COVID-19 ALTERNATE WORK LH ORDER PREVIOUSLY ISSUED AUTHORIZATION TO PROCEED. OBLIGATED AMOUNT INCREASED $214,161.68. |
Telecommunications and Transmission |
ASRC FEDERAL DATA SOLUTIONS, LLC |
July 28, 2020 |
$214,162 |
DESIGN AND FABRICATION REQUIREMENTS FOR A ROTARY-WING TEST STAND FOR THE NASA ICING RESEARCH TUNNEL (IRT). THE TEST STAND WILL ALLOW FOR THE INSTALLATION AND MOUNTING OF ROTARY-WING VEHICLES AND COMPONENTS FOR ICING TESTS IN THE IRT. |
Aeronautics/Space Technology Basic Research R&D |
CALSPAN SYSTEMS CORPORATION |
July 27, 2020 |
$0 |
DESIGN, ANALYSIS, AND FABRICATION OF NEW HARDWARE AND MODIFYING EXISTING SWASHPLATE OF THE ARMY ROTOR CONTROL SYSTEM (ARTS). |
Aeronautics/Space Technology Basic Research R&D |
CALSPAN SYSTEMS CORPORATION |
July 27, 2020 |
$0 |
ESDTS - 6DOF MOTION PLATFORM - ELECTRICAL SIX DEGREES OF FREEDOM PLATFORM. THE SIX DOF PLATFORM WILL BE A GROUND BASED TEST FACILITY AND WILL REPLACE AN EXISTING HYDRAULIC BASED SYSTEM AT JSC. |
Miscellaneous Equipment Installation |
MIKROLAR INC. |
July 27, 2020 |
$0 |
FABRICATION AND DESIGN OF BOLD STEP TEST WIND TUNNEL MODEL. |
Aeronautics/Space Technology Basic Research R&D |
CALSPAN SYSTEMS CORPORATION |
July 27, 2020 |
$0 |
REVITALIZE KENNEDY SPACE CENTER'S WATER AND WASTE WATER SYSTEMS, PHASE 6. MODIFICATION PROVIDES AN EQUITABLE ADJUSTMENT FOR IMPACTS RESULTING FROM RESTRICTED ACCESS DUE TO COVID 19. COMPLETION DATE EXTENDED TO 10/14/20 AND AN INCREASE OF $17,498 |
Miscellaneous Buildings Construction |
BARBER KLEIN - FORESIGHT JV, LLC |
July 24, 2020 |
$17,498 |
SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE (SACOM) |
Operation of Government Owned Government Operated R&D Facilities |
SYNCOM SPACE SERVICES LLC |
July 24, 2020 |
$0 |
CONSTRUCTION, MAINTENANCE, ENVIRONMENTAL AND TESTING SERVICES (COMETS)
CLIN 8 PRS (4200737305, 4200738083) ARE COVID-19 FUNDING FOR WEATHER&SAFETY LEAVE. |
Program Management/Support Services |
FIRELAKE-ARROWHEAD NASA SERVICES |
July 24, 2020 |
$271,319 |
THE PRIMARY OBJECTIVE OF THE TEAMS 3 CONTRACT IS TO CONDUCT AND SUPPORT RESEARCH AND TECHNOLOGY DEVELOPMENT IN ORDER TO MEET EVOLVING NASA MISSION OBJECTIVES. WORK REQUIREMENTS INCLUDE SUPPORT OF SCIENTIFIC RESEARCH ENGINEERING DESIGN, ANALYSIS, AND |
Other Management/Support R&D |
ANALYTICAL MECHANICS ASSOCIATES, INC. |
July 24, 2020 |
$5,171,420 |
N240 SEISMIC RISK REDUCTION, CLEAN ROOM THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. |
Repair or Alteration of Miscellaneous Buildings |
SOUTHWESTERN DAKOTAH, INC. |
July 23, 2020 |
$0 |
N245 SEISMIC RISK REDUCTION |
Repair or Alteration of Miscellaneous Buildings |
PATRIOT CONSTRUCTION, INC. |
July 23, 2020 |
$0 |
COVID-19 INCORPORATE ADVANCE AGREEMENT MOD
THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE). |
Space Vehicle Components |
BALL AEROSPACE & TECHNOLOGIES CORP. |
July 22, 2020 |
$0 |
SITE-WIDE FIRE AND HAZARD DETECTION SYSTEM AT STENNIS SPACE CENTER, MS |
Miscellaneous Buildings Construction |
SOUTHEAST CHEROKEE CONSTRUCTION, INC. |
July 21, 2020 |
$0 |
REPLACE OBSOLETE FIRE ALARM CONTROL PANELS (FACP), VARIOUS LOCATIONS, KENNEDY SPACE CENTER, FL, PCN: 99207. MODIFICATION EXTENDS CONTRACT COMPLETION DATE TO MAY 8, 2021 AS A RESULT OF THE RESTRICTED ACCESS COVID-19 SITUATION. |
Miscellaneous Buildings Construction |
A&H - AMBICA JV, LLC |
July 21, 2020 |
$0 |
GSFC OCCUPATIONAL MEDICAL SERVICES (OMS) |
Other Medical |
HEALTHCARE RESOURCE NETWORK, LLC |
July 20, 2020 |
$227,934 |
COVID-19 CANCELLATION OF ADVANCE AGREEMENT
PROVIDE OPERATIONS AND MAINTENANCE AND RELATED SERVICES FOR THE FACILITIES OPERATIONS DIVISION. PROVIDE UTILITY AVAILABILITY FOR CRITICAL OPERATIONS SUCH AS POWER, UNINTERRUPTIBLE POWER SUPPLY, GENERATORS, ELEVATORS, FIRE PROTECTION SYSTEMS, UTILITY CONTROL SYSTEM, AND HEATING, VENTILATION, AIR-CONDITIONING AND REFRIGERATION (HVAC/R)SYSTEMS MISSION SUPPORT OPERATION AND MAINTENANCE OF HIGH VOLTAGE SHOP AND CENTRAL POWER PLANS SNOW/ICE REMOVAL ROOF REPLACEMENT/REPAIR ASBESTOS ABATEMENT PAINTING/CAULKING PAVING/CONCRETE FENCE REPAIRS CHEMICAL WATER TREATMENT BOILER MAINTENANCE/REPAIR AND EMERGENCY SERVICES. |
Facilities Operations Support Services |
AKIMA SUPPORT OPERATIONS, LLC |
July 17, 2020 |
$0 |
COVID-19 INCORPORATE ADVANCE AGREEMENT MOD
THIS REQUIREMENT IS FOR THE DEVELOPMENT AND DELIVERY OF THE OPERATIONAL LAND IMAGER 2 (OLI-2) INSTRUMENT.
IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT, THE CONTRACT, ALL ASSOCIATED REQUIREMENTS DOCUMENTS, AND THE OTHER ATTACHMENTS AND APPLICABLE DOCUMENTS TO THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE EFFORT AND RESOURCES THAT INCLUDE, BUT ARE NOT LIMITED TO, PERSONNEL, SUBJECT MATTER EXPERTISE, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY FOR THE SUCCESSFUL AND ON-TIME IMPLEMENTATION OF THE DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TEST, ENGINEERING DATA ANALYSES, VERIFICATION, CALIBRATION, QUALIFICATION, AND DELIVERY OF THE OLI-2. THE CONTRACTOR SHALL ALSO PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY FOR SUPPORT TO OBSERVATORY I&T, SUPPORT TO MISSION LEVEL ACTIVITIES SUCH AS OBSERVATORY ENVIRONMENTAL TEST, LAUNCH VEHICLE INTEGRATION AND ON-ORBIT COMMISSIONING, AND SPECIAL STUDIES OF THE OLI-2. THE CONTRACTOR SHALL DELIVER TO THE GOVERNMENT AN OLI-2 THAT IS FULLY TESTED, CALIBRATED, AND HAS DEMONSTRATED COMPLIANT AND RELIABLE OPERATION IN ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT. |
Space Operations, Tracking and Data Acquisition R&D (Advanced Development) |
BALL AEROSPACE & TECHNOLOGIES CORP. |
July 16, 2020 |
$0 |
HAND SANITIZER TO COMBAT COVID-19 AND PREVENT ANY SPREAD |
Chemicals |
KMASK GROUP LLC, THE |
July 16, 2020 |
$100,728 |
REMOVE AND REPLACE ROOFS AT BUILDINGS 30S AND 32HB AT JOHNSON SPACE CENTER |
Miscellaneous Buildings Construction |
PONTCHARTRAIN PARTNERS, LLC |
July 15, 2020 |
$0 |
PACE GPS RECIEVER |
Radio and Television Communication Equipment, Airborne |
RUAG SPACE GMBH |
July 15, 2020 |
$9,000 |
HAND SANITIZER |
Chemicals |
JAHNDA GROUP, LLC, THE |
July 15, 2020 |
$31,837 |
HAND SANITIZER |
Chemicals |
JAHNDA GROUP, LLC, THE |
July 15, 2020 |
$0 |
COVID-19 INCORPORATE ADVANCE AGREEMENT MOD
THE GOAL OF THIS RESEARCH IS TO CONDUCT A FEASIBILITY STUDY TO VALIDATE THE RELATIVE EASE AND AFFORDABILITY OF REPURPOSING ROCKET UPPER STAGES TO SERVE AS HABITATS, BEGINNING WITH A DEMONSTRATION OF CONVERTING AND ATTACHING A CENTAUR UPPER STAGE TO THE INTERNATIONAL SPACE STATION (ISS).
THIS CONTRACT IS IN SUPPORT OF THE FOLLOWING LIST OF NASA OBJECTIVES FOR THIS PHASE OF THE HABITATION SYSTEM DEVELOPMENT:
1. DEVELOP AND REFINE THE EVOLVABLE, MODULAR ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS, STANDARDS, AND COMMON INTERFACES REQUIRED TO ENABLE INTEROPERABILITY OF THE AGGREGATE SYSTEM TO PROVIDE LONG DURATION DEEP SPACE TRANSIT HABITATION. ACHIEVE A LEVEL OF FIDELITY IN TECHNICAL AND PROGRAMMATIC FEASIBILITY CONCEPTS FOR GROUND PROTOFLIGHT VEHICLES-MODULES-UNITS/
2. FURTHER DEFINE AND DEVELOP DEEP SPACE HABITATION CAPABILITIES THAT CAN BE FLOWN AS CO-MANIFESTED PAYLOADS ON SLS BLOCK 1B WITH AN INITIAL SLS CO-MANIFESTING CAPABILITY OF 4 TO 6 METRIC TONS STARTING IN EARLY-TO-MID 2020S, OR LATER IN THE 2020S ON A CARGO-ONLY VERSION OF SLS, OR ON ALTERNATIVE LAUNCH VEHICLES. NOTE THE HABITATION SYSTEM CONCEPT CAN BE SEPARATED INTO MULTIPLE INTEGRATED MODULES WITH DISTRIBUTED FUNCTIONS. IF THE HABITATION CONCEPT IS NOT FLOWN ON SLS, PROVIDE DETAILS OF THE LAUNCH VEHICLE ASSUMPTIONS.
3. MATURE THE DESIGN OF THE OVERALL DEEP SPACE INTEGRATED SYSTEM(S) AND, AT A MINIMUM, DEVELOP A FULL SIZE, GROUND PROTOTYPE OF THE PORTION OF YOUR DESIGN THAT PROVIDES THE MAJORITY OF THE HABITATION CAPABILITIES FOR FORM, FIT, AND PARTIAL FUNCTION INTEGRATION TESTING.
4. IDENTIFY COMMERCIAL CAPABILITY DEVELOPMENT FOR LEO THAT INTERSECTS NASA LONG DURATION DEEP SPACE HABITATION REQUIREMENTS ALONG WITH ANY POTENTIAL OPTION TO MAXIMIZE THE LEVERAGING OF COMMERCIAL LEO ADVANCEMENTS TOWARDS MEETING NASA LONG DURATION DEEP SPACE HABITATION NEEDS.
5. PROVIDE INFORMATION ON COMPANY END-TO-END DEVELOPMENT EFFORT AND ROM COSTS FOR FLIGHT DEVELOPMENT - COMPANIES TO PROVIDE A PROPOSAL, SOW, AND FULLY PRICED APPENDIX A EFFORTS AND ROM COSTS FOR SUBSEQUENT PHASES FOR ENGINEERING AND FLIGHT UNIT DEVELOPMENT.
THIS CONTRACT IS FOR THE LXION TEAM TO COMPLETE BOTH THE PHASE 1 AND PHASE 2 WORK IN A RAPID, EFFICIENT, AND JUDICIOUS MANNER, FINISHING BOTH THE CORE FEASIBILITY AND THE CONCEPT/ARCHITECTURE
PHASES OF THE STUDY BEFORE THE END OF CALENDAR YEAR 2017. THIS WILL ALLOW THE LXION TEAM TO
QUICKLY MOVE INTO DEVELOPING HARDWARE, INCLUDING OUTFITTING AN ACTUAL CENTAUR IN EARLY
2018, AND BEING READY FOR THE FIRST FLIGHT OF THE LXION HABITAT AS EARLY AS 2020.
THE FOCUS OF THE IXION INITIATIVE PROPOSAL IS TO DEVELOP AND DEMONSTRATE THE CAPABILITY TO
REPURPOSE PROPELLANT TANKS INTO HABITABLE VOLUMES ON-ORBIT FOR USE IN AN OVERALL IN-SPACE
ARCHITECTURE. THE CAPABILITY WILL BE DEMONSTRATED IN TWO PHASES. FIRST IS A CORE FEASIBILITY
STUDY AS PHASE 1 AND THEN THE IXION TEAM WILL PLAN A COMPREHENSIVE SYSTEMS CONCEPTS AND
ARCHITECTURE STUDY FOR PHASE 2 SHOULD THE FEASIBILITY STUDY MERIT SUCH FURTHER WORK. REPORTS
WILL INCLUDE COST-BENEFIT ANALYSES OF REPURPOSING STRATEGIES AND TECHNIQUES THAT ARE MOST
ATTRACTIVE. A CON-OPS MEDIA PRESENTATION WILL BE DEVELOPED THROUGHOUT BOTH PHASES 10
ILLUSTRATE THE STRATEGY AND WILL BE ADDED TO AND ENHANCED AS THE PROJECT PROGRESSES. |
Space Science/Applications Basic Research R&D |
NANORACKS, LLC |
July 15, 2020 |
$0 |
UTAH STATE UNIVERSITY (USU) SHALL SUPPORT NASA MARSHALL SPACE FLIGHT CENTER (MSFC) AS DEFINED IN THIS DOCUMENT. USU SHALL PROVIDE THE LANGMUIR PROBE, IMPEDANCE PROBE, ELECTRIC FIELD PROBE, STAR CAMERA AND TECHNICAL EXPERTISE AND ASSESSMENT SUPPORT SERVICES FOR THE SCINTILLATION PREDICTION OBSERVATIONS RESEARCH TASK (SPORT). |
Other Engineering Development R&D |
UTAH STATE UNIVERSITY |
July 15, 2020 |
$26,283 |
THE PURPOSE OF THIS PROCUREMENT IS TO REPLACE THE ROOF ON BUILDING 4561, PER FWR 4397198. |
Miscellaneous Buildings Construction |
VEC VALLEY ELECTRIC INC |
July 14, 2020 |
$0 |
THE TEST AND OPERATIONS SUPPORT CONTRACT (TOSC) IS A COST-PLUS-AWARD-FEE CONTRACT WITH AN INDEFINITE DELIVERY INDEFINITE QUANTITY TASK ORDERING PROVISION. TOSC PROVIDES A PROCESSING CONTRACT FOR THE KENNEDY SPACE CENTER (KSC) SUPPORTING MULTIPLE CUSTOMERS. THE SCOPE OF THIS CONTRACT INCLUDES PROGRAM MANAGEMENT AND CONTROL SAFETY AND MISSION ASSURANCE INFORMATION MANAGEMENT PROCESSING SUPPORT SYSTEMS AND INTEGRATION FLIGHT HARDWARE PROCESSING GROUND SYSTEMS OPERATIONS, MAINTENANCE AND SUSTAINING ENGINEERING LOGISTICS AND SPACEPORT SERVICES. TOSC PROVIDES OVERALL MANAGEMENT AND IMPLEMENTATION OF GROUND SYSTEMS CAPABILITIES, FLIGHT HARDWARE PROCESSING AND LAUNCH OPERATIONS AT KSC IN FLORIDA. THESE TASKS WILL SUPPORT THE INTERNATIONAL SPACE STATION, GROUND SYSTEMS DEVELOPMENT AND OPERATIONS, AND THE SPACE LAUNCH SYSTEM, ORION MULTI-PURPOSE CREW VEHICLE AND LAUNCH SERVICES PROGRAMS. TOSC ALSO PROVIDES GROUND PROCESSING FOR LAUNCH VEHICLES, SPACECRAFT AND PAYLOADS IN SUPPORT OF EMERGING PROGRAMS, COMMERCIAL ENTITIES AND OTHER GOVERNMENT AGENCIES AS DESIGNATED BY THE GOVERNMENT. SERVICES INCLUDE ADVANCED PLANNING AND SPECIAL STUDIES DEVELOPMENT OF DESIGNATED GROUND SYSTEMS OPERATIONAL SUPPORT FOR DESIGN AND DEVELOPMENT OF FLIGHT HARDWARE AND GROUND SYSTEMS SPACECRAFT, PAYLOAD, AND LAUNCH VEHICLE SERVICING AND PROCESSING GROUND SYSTEMS SERVICES AND LOGISTICS AND OTHER PROCESSING SUPPORT SERVICES. FLIGHT HARDWARE PROCESSING AND SERVICING ACTIVITIES INCLUDE ASSEMBLY, INTEGRATION, CHECKOUT, AND DEPOT-LEVEL MAINTENANCE AND REPAIR. LAUNCH VEHICLE AND SPACECRAFT OPERATIONS INCLUDE ADVANCED PLANNING, ELEMENT PROCESSING, INTEGRATION, TEST, LAUNCH AND RECOVERY SERVICES. GROUND SYSTEMS SERVICES INCLUDE OPERATIONS, MAINTENANCE AND VALIDATION OF ASSOCIATED GROUND SYSTEMS AND SUPPORT EQUIPMENT NECESSARY FOR HUMAN SPACE FLIGHT AND EXPLORATION. CONTRACT ACTIVITIES WILL BE PERFORMED IN THE MOST COST-EFFECTIVE AND EFFICIENT MANNER SUPPORTING THE GOVERNMENT'S PRIORITIES FOR SAFETY, MISSION SUCCESS, CUSTOMER SATISFACTION AND INNOVATION WHILE MAINTAINING FLEXIBILITY AND RESPONSIVENESS TO CHANGING REQUIREMENTS. WITH THE AWARD OF THIS CONTRACT, KSC IS POSITIONING ITSELF FOR THE NEXT ERA OF SPACE EXPLORATION... MOD 272: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE ADDENDUM TO THE ADVANCED AGREEMENT DUE TO COVID-19 |
Space Flight Management/Support R&D |
JACOBS TECHNOLOGY INC. |
July 14, 2020 |
$0 |
SANITARY SEWER SYSTEM RECAPITALIZATION |
Miscellaneous Buildings Construction |
DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. |
July 14, 2020 |
$0 |
COVID-19 FUNDING MOD
SUPPORT FOR NASA'S HUMAN CAPITAL PROGRAM |
Other Professional Services |
LOGISTICS MANAGEMENT INSTITUTE |
July 10, 2020 |
$205,168 |
MEDICAL AND FITNESS SERVICES CONTRACT FOR GLENN RESEARCH CENTER |
Other Medical |
HSG, LLC |
July 10, 2020 |
$356,000 |
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS |
Aeronautics/Space Technology Basic Research R&D |
ATK LAUNCH SYSTEMS INCORPORATED |
July 09, 2020 |
$0 |
A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS |
Miscellaneous Buildings Construction |
HEALTHEON, INC. |
July 09, 2020 |
$188,235 |
LABORATORY SUPPORT SERVICES AND OPERATIONS (LASSO) CONTRACT. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REVISION 01 OF THE ADVANCE AGREEMENT BETWEEN NASA AND CONTRACTOR REGARDING WORK AND COST IMPACTS RESULTING FROM THE CORONAVIRUS (COVID-19) SITUATION. |
Other Professional Services |
AECOM MANAGEMENT SERVICES, INC. |
July 09, 2020 |
$0 |
NASA END-USER SERVICES&TECHNOLOGIES (NEST) |
IT and Telecom Facility Operation and Maintenance |
LEIDOS, INC. |
July 08, 2020 |
$57,940 |
HURRICANE MATTHEW REPAIRS, HANGAR AF. MODIFICATION EXTENDS THE CONTRACT COMPLETION DATE BY 81 DAYS FROM JULY 14, 2020 TO OCTOBER 3, 2020 AS A RESULT OF RESTRICTED ACCESS TO JOHN F. KENNEDY SPACE CENTER (KSC) COVID-19 SITUATION. |
Miscellaneous Buildings Construction |
ODYSSEY INTERNATIONAL, INC. |
July 08, 2020 |
$0 |
DECONSTRUCT FACILITIES&STRUCTURES, VARIOUS LOCATIONS. AS RESULT OF COVID 19 LIMITED ON-SITE ACTIVITIES AT KENNEDY SPACE CENTER, THE CONTRACT PERIOD OF PERFORMANCE COMPLETION DATE IS CHANGED FROM 6/30/2020 TO 8/31/2020. |
Miscellaneous Buildings Construction |
ARS ALEUT REMEDIATION LLC |
July 07, 2020 |
$0 |
PROVIDE OPERATIONS AND MAINTENANCE AND RELATED SERVICES FOR THE FACILITIES OPERATIONS DIVISION. PROVIDE UTILITY AVAILABILITY FOR CRITICAL OPERATIONS SUCH AS POWER, UNINTERRUPTIBLE POWER SUPPLY, GENERATORS, ELEVATORS, FIRE PROTECTION SYSTEMS, UTILITY CONTROL SYSTEM, AND HEATING, VENTILATION, AIR-CONDITIONING AND REFRIGERATION (HVAC/R)SYSTEMS MISSION SUPPORT OPERATION AND MAINTENANCE OF HIGH VOLTAGE SHOP AND CENTRAL POWER PLANS SNOW/ICE REMOVAL ROOF REPLACEMENT/REPAIR ASBESTOS ABATEMENT PAINTING/CAULKING PAVING/CONCRETE FENCE REPAIRS CHEMICAL WATER TREATMENT BOILER MAINTENANCE/REPAIR AND EMERGENCY SERVICES. |
Facilities Operations Support Services |
AKIMA SUPPORT OPERATIONS, LLC |
July 07, 2020 |
$1,543,790 |
BUILDING 1293 REPLACE OUTDATED JOHNSON HVAC CONTROLS WITH TRANE UPGRADE. |
Refrigeration, Air Conditioning and Air Circulating Equipment Installation |
DAMUTH SERVICES, INC. |
July 07, 2020 |
$0 |
TRANE DDC SYSTEM UPGRADE |
Refrigeration, Air Conditioning and Air Circulating Equipment Installation |
DAMUTH SERVICES, INC. |
July 07, 2020 |
$0 |
B221 REPLACE RING BUS |
Miscellaneous Buildings Construction |
PONTCHARTRAIN PARTNERS, LLC |
July 07, 2020 |
$0 |
TASK ORDER FOR FACILITIES OPERATIONS MAINTENANCE SUPPORT SERVICES (FOMSS) - AECOM MANAGEMENT SERVICES, INC OPTION YEAR 2 FOR COVID-19 INVOICES ONLY |
Government Owned Government Operated R&D Facilities Maintenance |
AECOM MANAGEMENT SERVICES, INC. |
July 07, 2020 |
$434,829 |
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE STATEMENT OF WORK (SOW), PROVIDE THE FUNDING INCREASE FOR THE CHANGE, AND EXTEND THE PERIOD OF PERFORMANCE...A. REMOVE CURRENT SOW AND REPLACE WITH ATTACHED SOW REV. A...B. PRICE HAS INCREASED BY |
Repair or Alteration of Miscellaneous Buildings |
HYDRAULIC AND PNEUMATIC SYSTEMS INC |
July 06, 2020 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATED AAO RFP OP1 001 NASA COVID CONTRACT TRACING AND TRACKING, DE OBLIGATE COVID 19 FUNDING FROM PR 4200732429, AND OBLIGATE ADDITIONAL COVID 19 FUNDING. |
IT and Telecom Facility Operation and Maintenance |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION |
July 06, 2020 |
$639,315 |
ENGINEERING SERVICES DURING CONSTRUCTION TO REPLACE OPERATIONS SUPPORT BUILDING 2 AIR HANDLING UNIT-11. MOD EXTENDS PERIOD OF PERFORMANCE TO 10/28/20 IN ACCORDANCE WITH TECHNICAL DIRECTIVE 03, AT NO COST TO DUE TO COVID-19 SITE RESTRICTIONS. |
Other Architecture and Engineering Services |
JOHNSON, LEVINSON, RAGAN, DAVILA, INC. |
July 06, 2020 |
$0 |
OCCUPATIONAL HEALTH SUPPORT SERVICES |
Other Medical |
JOHNSON VENTURE MANAGEMENT SOLUTIONS, INC. |
July 02, 2020 |
$297,096 |
HIGH PRESSURE GAS PIPING SYSTEMS REPLACEMENT PHASE II |
Gas EPG Facilities Construction |
HEALTHEON, INC. |
July 01, 2020 |
$0 |
HIGH PRESSURE AIR DRYER AND COMPRESSOR REPLACEMENT |
Pumps And Compressors Equipment Installation |
BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC |
July 01, 2020 |
$0 |
COMMUNICATIONS, OUTREACH, MULTIMEDIA, AND INFORMATION TECHNOLOGY (COMIT) CONTRACT. |
Other IT and Telecommunications |
MORI ASSOCIATES, INCORPORATED |
July 01, 2020 |
$0 |
THIS IS WORK IS FOR THE DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TESTING A VARIETY OF WINGED COMPOUND ROTORCRAFT CONFIGURATIONS IN THE 14- BY 22-FOOT SUBSONIC TUNNEL BY WAY OF A TRAVERSING ASSEMBLY MOUNTED BELOW |
Aeronautics/Space Technology Basic Research R&D |
ADVANCED TECHNOLOGIES, INC. |
June 30, 2020 |
$86,054 |
THE PURPOSE OF THIS ORDER IS: "CUSTODIAL AND REFUSE COLLECTION SERVICES - PERFORM ENHANCED CLEANING OF THE PEGASUS BARGE." |
Custodial Janitorial Services |
ALL NATIVE SYNERGIES COMPANY |
June 30, 2020 |
$6,017 |
THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. |
Space Flight Operational Systems Development R&D |
LOCKHEED MARTIN CORPORATION |
June 30, 2020 |
$0 |
DESIGN AND FABRICATION REQUIREMENTS FOR A ROTARY-WING TEST STAND FOR THE NASA ICING RESEARCH TUNNEL (IRT). THE TEST STAND WILL ALLOW FOR THE INSTALLATION AND MOUNTING OF ROTARY-WING VEHICLES AND COMPONENTS FOR ICING TESTS IN THE IRT. |
Aeronautics/Space Technology Basic Research R&D |
CALSPAN SYSTEMS CORPORATION |
June 29, 2020 |
$0 |
FABRICATION AND DESIGN OF BOLD STEP TEST WIND TUNNEL MODEL. |
Aeronautics/Space Technology Basic Research R&D |
CALSPAN SYSTEMS CORPORATION |
June 29, 2020 |
$0 |
COMMON RESEARCH MODEL - DESIGN AND FABRICATION OF THE 10% ACOUSTICALLY TREATED-HIGH LIFT COMMON RESEARCH MODEL. THE NEW 10% AT-HL COMMON RESEARCH MODEL WILL BE TESTED AT NASA LANGLEY'S 14X22 FT. WIND TUNNEL. |
Aeronautics/Space Technology Basic Research R&D |
EAGLE AVIATION TECHNOLOGIES, LLC |
June 29, 2020 |
$0 |
VACUUM SPIN STAND - DESIGN, ANALYSIS AND FABRICATION OF A NEW VACUUM SPIN STAND SUITABLE FOR TESTING ROTOR BLADES INSIDE THE NASA LANGLEY RESEARCH CENTER'S LANGLEY AEROTHERMODYNAMICS LABORATORY (LAL) 60-FT VACUUM SPHERE TEST CHAMBER (60VSTC). |
Aeronautics/Space Technology Basic Research R&D |
ADVANCED TECHNOLOGIES, INC. |
June 29, 2020 |
$0 |
NASA HUMAN LANDING SYSTEM (HLS) DESCENT STUDY ELEMENT AND PROTOTYPE, TRANSFER VEHICLE ELEMENT STUDY AND PROTOTYPE, AND REFUELING STUDY ELEMENT AND PROTOTYPE. |
Other Applied Research/Exploratory Development R&D |
BOEING COMPANY, THE |
June 26, 2020 |
$0 |
COVID-19 3610 FUNDING FOR NASA INTEGRATED COMMUNICATIONS SERVICES
(NICS) NNM11AA04C |
IT and Telecom Facility Operation and Maintenance |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION |
June 25, 2020 |
$47,986 |